1 / 6

Slide 1

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: IG L2R Closing Report for July 2012 Date Submitted: July 2012 Source: Clint Powell, Powell Wireless Commsulting, LLC Contact: Clint Powell, Powell Wireless Commsulting, LLC

halil
Download Presentation

Slide 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: IG L2R Closing Report for July 2012 Date Submitted: July 2012 Source: Clint Powell, Powell Wireless Commsulting, LLC Contact: Clint Powell, Powell Wireless Commsulting, LLC Voice: +00 480-586-8457, E-Mail: cpowell@ieee.org Re: IG L2R Closing Report for July 2012 Plenary Abstract: Closing Report for the IG L2R Sessions in San Diego Purpose: Layer 2/Mesh Under Routing Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Slide 1 Slide 1

  2. IG-L2R • Determine the level of interest for a project onLayer 2/Mesh Under Routing and make recommendation to WG. Slide 2 Slide 2

  3. Meeting Goals • Determine Interest Level of Layer 2/Mesh Under Routing • Timeslots • Wed. AM1 • Open and Review Call for Interest/Presentations • Hear 3 Presentations incl. Q&A • Thurs. AM1 • Discuss Next Steps • Formulate Recommendation to WG Slide 3 Slide 3

  4. IG-L2R Group Participation • Avg. # of Individuals Attending sessions: 30 • Avg. # of Entities Represented in sessions: 22 Slide 4 Slide 4

  5. Status • Minutes posted as doc. # 15-12-0403-01-0l2r • Overwhelming consensus to recommend to WG to continue as an Interest Group at next mtg. • Straw Poll #5 (28 in room) • Recommend to Working Group to continue as an IG? • YES: 22 • NO: 0 • Abstain: 5 • New to room*: 5 • *Was not in Wed. AM1 IG L2R Session Slide 5 Slide 5

  6. Next Steps • Palm Springs (in Sept.) • Issue call for Interest/Presentations for Sept. mtg. • Expand topical area per mins. • Related work in other areas • Work on generating and giving a Tutorial(at next Interim or Plenary) • See mins. (doc. # 15-12-0403-01-0l2r) for details Slide 6 Slide 6

More Related