Severity 4 & 5 Observations Dec. ’2010 East Region

Severity 4 & 5 Observations Dec. ’2010 East Region. Total severity 4 and 5 observation for the month of Dec.’10:- 17 Nos. After. Severity 5- One crane released from assembled rafter without proper support & communication .( LD#3) (Model-II) _East .

ham
Download Presentation

Severity 4 & 5 Observations Dec. ’2010 East Region

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Severity 4 & 5 Observations Dec. ’2010 East Region

  2. Total severity 4 and 5 observation for the month of Dec.’10:- 17 Nos.

  3. After Severity 5- One crane released from assembled rafter without proper support & communication.( LD#3) (Model-II) _East . Action Taken:- Provided proper supports and released crane sling.

  4. Severity 5- Four workers came at a place in between two lifeline posts for shifting of purlin.( LD#3) (Model-II) _East. Action Taken:- Activity stopped and purlin shifted by crane as weight is more.

  5. Severity 4- Welding cable was being extended by using holder. (Cable Jointer not used)( LD#3) (Model-II) _East. Action Taken:- Activity stopped and removed the extended cable.

  6. Severity 4- Four workers came in boom-lift bucket . .( LD#3) (Model-II) _East_Jharkhand. Action Taken:- Training imparted and JCC(Job Cycle Change) done for those workers and boom lift operator.

  7. Severity 4 & 5 Observations Dec. ’2010 West Region (Maharashtra)

  8. Total Severity 4 & 5 Observation for the month of Dec.’10- 32Nos

  9. MD’s Safety Audit at Churchgate site After

  10. Severity 5- Lifeline not fixed properly at the eave of roof of low bay area.(TGW, Indor., J S Enterprises) _West- Maharashtra Action Taken:- Lifeline at eave side provided.

  11. Severity 5- Electrical board were used without ON-OFF switch & No ELCB.(ChurchGate, Mumbai – Sai Project ) _West- Maharastra Action Taken:- Electric Board with ELCB mobilized.

  12. Severity 5-Leakage Found in hydraulic jack of Crane. (Church gate, Mumbai – Sai Projects) _West- Maharashtra Action Taken:- Corrected.

  13. Severity 4 & 5 Observations Dec. ’2010 West Region (Gujarat)

  14. Total severity 4 and 5 observation for the month of Dec.’10- 27Nos

  15. Severity 4:- Full body Safety harness without Shock absorber & Single Lanyard, snap hook instead of Scaffolding Hook being used. ((Siemens Mundra – C.P.P.L.) _West- Gujrat Action Taken:- Safety harness with shock absorber with double lanyard provided.

  16. Severity 4:- Two Riggers found working by standing on Girt . ((Siemens Mundra – C.P.P.L.) _West- Gujrat Action Taken:- Activity stopped and Boom Lift used for the same activity.

  17. Severity 5- Painting Compressor found without guard .(Siemens Mundra – C.P.P.L.) _West- Gujrat Action Taken:- Instruct Builder to provide Guard immediately.

  18. Severity 5- Gas Cutting cylinder found on road & valve found bend.(Siemens Mundra – C.P.P.L.) _West- Gujrat Action Taken:- Cylinder was removed from site.

  19. Severity 4:- Gas Cutting Hose found Damage & joint found in between .(Siemens, Mundra – C.P.P.L.) _West- Gujrat Action Taken:- Damaged hose removed from site.

  20. Severity 5- In Gas cutting set Flash back arrestor were used only at torch side ..(Jindal SS, Savli, Vadodara - R.K. Builder) _West- GUJRAT Action Taken:- Activity stopped immediately and flash back arrestor provided.

  21. Severity 5- Scaffolding were used without locked wheel and cross bracing.(Jindal SS, Savli, Vadodara - R.K. Builder) _West- GUJRAT Action Taken:- Activity stopped and proper scaffolding provided.

  22. Severity 5- Electrical board were used without ON-OFF switch.(Jindal SS, Savli, Vadodara - R.K. Builder) _West- GUJRAT Action Taken:- Activity stopped and electrical board replaced.

  23. Severity 4 & 5 observations Dec. ’2010 AP &K Region

  24. Total severity 4 and 5 observation for the month of Dec.’10- 21 Nos

  25. Severity 4 :- Worker found walking on the rafter where there is no fall protection systems ( Life line Post and lifeline)– (Autoliv site. )_AP&K Action Taken: Activity stopped & life line provided.

  26. Severity 4 :-Area not barricaded below where height work is in going on. (Autoliv site)_AP&K Action Taken: Activity stopped work & area barricaded.

  27. Severity 4 :- Life line post and lifeline not provided properly- (Autoliv site)_AP&K Action Taken: Life line post & life line provided as per TBSL standard.

  28. Severity 4-:-Vehicle movement under suspended load. (Auto liv)_AP&K Action Taken: Instructed builder personnel barricade the area to avoid below movement

  29. Severity 4 & 5 observations Dec. ’2010 TN Region

  30. Total severity 4 and 5 observation for the month of Dec.’10- 18 Nos

  31. Severity 4-: Hydra wire rope damaged – (Rock Worth)_TN Action Taken: Activity stopped and hydra sent out .

  32. Severity 4-: Life line rope has joints – (Rock Worth)_TN Action Taken: Entire Life line rope Replaced.

  33. Severity 4-: Poor Housekeeping & Unhygienic woking condition – (SCL Site)_TN Action Taken :Instructed builder to Remove all unwanted insulation material - Closed

  34. Severity 4-: Un safe scaffold – (SCL Site)_TN Action Taken : Rectified & safe access provided- Closed

  35. Severity 4-:Inproper Electrical Practise – (SCL Site)_TN Action Taken : Informed customer to proved proper electrical supply - Not Closed

  36. Severity 4-:Improper material staking – (SCL Site)_TN Action Taken : Housekeeping done.

  37. Severity 4-:Building erected With out any life line rope –(Sinduja site.)_TN Action Taken : Stopped all activity & issued warning letter

  38. Severity 4-: Mobile scaffold erected wheel have no locks –(Sheenlac Site)_TN Action Taken : Given proper training and immediately removed all unsafe scaffold.

  39. Severity 4-Worker found standing on the girt to fix the next level girt. Action Taken: Proper scaffolding with working plat form to be used to work at height. Work stopped scaffolding moved from other side.

  40. Severity 4 & 5 observations Dec. ’2010 North Region

  41. Total severity 4 and 5 observations for the month of Dec.’10:- 05 Nos.

  42. Severity 4-: Limit switch of hydra found not in working condition & also safety latch found damaged, (Siemens, Mohindergadh ) Action Taken: Stopped use of equipment & corrected