An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IndustrialDistribution Warehouse Abigail Bush Joseph Friesenhahn Hank Hampton Ralph Morfin Rusty Staudt December 7, 2013

  2. Project Team Staudt

  3. Project Overview • 3019 NE Loop 410 • San Antonio, Texas • At intersection of Loop 410 and IH35 • 12.048 acres • Zoning - Industrial • Adjacent to Perrin Beitel Creek and its Tributary • Titan Perrin Creek Development, Phase II Staudt

  4. Data Collection • Review Data • Survey • Geotechnical • Tree Survey • Grading Staudt

  5. Utility Coordination • CPS • Overhead • Primary • Secondary • SAWS • 30” RCP Sewer Main • 30” CSC Water Main Hampton

  6. Traffic Analysis • Traffic Impact Analysis • Phase I • TxDOT Permits • Driveway • Waterline on frontage • Paving Plan Hampton

  7. Environmental • Environmental Impact • SW3P • Erosion Control Bush

  8. Hydrology and Hydraulics • Floodplain Development Permit • Parking lot with flood depth < 6” • Ineffective flow • Impact to WSEL Bush

  9. Drainage • Mandatory Detention Area • Evaluate existing facility • Stub out 2-24” pipes for development Bush

  10. Building Design • Project consists of a 50,000-SF steel, build-to-suit office and distribution facility in Titan Perrin Creek Friesenhahn

  11. Structure and Foundation • Structural Codes: • ASCE 7-05 • AISC 13th Edition • IBC 2009 • Slab on Grade Friesenhahn

  12. Additional Services • Fire Protection Plan • Landscape Architecture Morfin

  13. Project Schedule May March January February April Preliminary Intermediate Final Morfin

  14. Cost Analysis Morfin

  15. Questions?