240 likes | 416 Views
Paperless Customs. - June 2006 -. Agenda. Process Highlights Conventional concept Integrated concept Periodical Reporting PLDA IT Infrastructure Q&A. Process Highlights. High level Concept. PLDA. =. Validation. Selection. Declaration. Release. Acceptance. Rejection. Queue.
E N D
PaperlessCustoms - June 2006 -
Agenda • Process Highlights • Conventional concept • Integrated concept • Periodical Reporting • PLDA IT Infrastructure • Q&A
High level Concept PLDA = Validation Selection Declaration Release Acceptance Rejection Queue Examination
If my shipment is queued for examination… Office hours 16u00 9u00 15u30 Not queued Released at ± 15uxx PLDA queue If not selected and queue time [first hour] ends after 4 pm 1 hr waiting time Release ? selected queue +1 hr extra waiting time Release [17u30]
At customs office E-mail Fax In-house Supporting documentation Supporting documentation can be provided to customs upon their request in different ways Authorization needed
Conventional Concept Sadbel PLDA
ANR … BRU Conventional Concept Trader NCTS PLDA PLDA
Advantages • Copy – paste from current situation, existing process can continue to exist with minimal changes • Requires minimal effort • Supporting web application available at the authorities for low volume activities
Attention points • “plug & play” is not exactly possible due to changing SAD legislation • A new application needed to exchange information with customs authorities (or web application) • Don’t look at PLDA in isolation. Look ahead to what’s in store for the next coming years (ECS, ICS, …).
Speed Cost control Predictability Key Elements
ANR … BRU Integrated concept Declaration data PLDA Trader “Distant examination” Declaration location Examination location
ANR … BRU Integrated concept in practice Deconsol. facility Customer Nike Declaration location Examination location
Advantages • Abolishes NCTS at national level • Allows integration with internal business systems • Increases control on logistics execution • Allows for better cost control • Better and safer facilities for examination of shipments
Open questions ? • Conflicts with NCTS process (for shipments arriving via other member states) – which process/system prevails ? • How to provide unloading results to PLDA system for bonded warehouse entries ? • Process & lead time for adaptation of existing authorization(s) ?
Reporting • All reports have to be provided in xml format. • So called ‘attached listings’ in hard copy format, or on cd-rom or… are not allowed any longer • Month End reporting (IM4 – after bonded storage) • Periodical Entry reports for simplified procedure • Periodical Exit reports for simplified procedure • CIV reporting • Requires software development
Internal strategy for PLDA IT infrastructure • ‘in-house’ developed application • Integrated with Bonded Warehouse application • Integrated with Logistics Execution applications • NCTS will be kept separately until full integration is possible