An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FHWA Update AASHTO Committee on Construction August 12, 2019 Rob Elliott, PE Technical Director, CPM Team FHWA Resource Center

  2. Outline • Program Updates and OIG audits • Everyday Counts and Innovation Deployment • FHWA Research • FHWA Resource Center

  3. FHWA Policy on Electronic Records • FHWA does not have an explicit policy for electronic contract records. • Follow State record keeping policies. • Must be retained for a 3-year period from the date of final acceptance (2 CFR 200.333). • See FHWA’s July 7, 1993 and September 21, 1989 memos (records must be acceptable from an engineering, audit, and legal standpoint) • https://www.fhwa.dot.gov/construction/cqit/econtract.cfm

  4. USDOT Office of the Inspector General Audits • March 13, 2019 – “FHWA Lacks Adequate Oversight and Guidance for Engineer’s Estimates” • May 29, 2019 – “Inadequate Data and Guidance Hinder FHWA Force Account Oversight”

  5. Revisions to FHWA Policy on Materials or Product Selection (23 CFR 635.411) • November 14, 2018 FHWA published a Notice of Proposed Rule Making to revise regulatory policy. • FHWA received 107 comments (16 State DOTs, 14 associations, 22 manufacturers or suppliers, 4 construction companies, and numerous individuals). • A final rule is anticipated in mid-to-late 2019. • Docket web site: https://www.regulations.gov/docket?D=FHWA-2018-0036

  6. Market-ready, Proven… underutilized Every State advanced 14 or more of the 43 innovations promoted in the first four EDC rounds, and 28 States adopted 30 or more innovations.

  7. EDC-4: e-Construction • e-Construction is defined as the collection, review, approval, and distribution of highway construction contract documents in a paperlessenvironment from project advertisement to acceptance. • It includes: • Bidding and contract award • Project construction and management • Project inspection and testing • Project acceptance • Project close-out Source: FHWA

  8. EDC-4 e-Construction & Partnering: Deployment Activities Website Resources Peer Exchanges Webinar Series Image Sources: FHWA, Michigan DOT Education Connection YouTube Videos Regional Workshop/PA FHWA Tech Documents https://www.fhwa.dot.gov/construction/econstruction/

  9. Unmanned Aerial Systems (UAS) Image: FHWA • FHWA is currently gearing up for a 2-year EDC-5 Implementation initiative on UAS • What are they used for? • Structural Inspection • Construction Inspection • Emergency Response

  10. UAS Benefits “Workforce was 45% more productive and the project was completed ahead of schedule” - Utah DOT “Reduced lane closures and increased safety for both workers and the traveling public” - New Jersey DOT “An average cost savings of 40% over traditional inspection methods” - Minnesota DOT Source: Ohio DOT (both photos) Improved Safety Increased Efficiency Increased Quality Reduced Costs

  11. Innovations • Building Information Modeling • Probabilistic Risk Based Estimating Engineer’s Estimate BIM Bridge Components Images Source: FHWA Source: FHWA

  12. FHWA Research • Automation in Highway Construction • Report: www.fhwa.dot.gov/publications/research/infrastructure/pavements/16031/index.cfm • TechBrief: www.fhwa.dot.gov/publications/research/infrastructure/pavements/16032/index.cfm • Feasibility of Mapping and Marking Underground Utilities by State Transportation Departments • Report: www.fhwa.dot.gov/publications/research/infrastructure/pavements/16019/index.cfm • TechBrief: www.fhwa.dot.gov/publications/research/infrastructure/pavements/18070/index.cfm • Determination of Improved Pavement Ride Quality (Smoothness) when Utilizing 3D Modeling and Automatic Machine Guidance (AMG) [in publication review] • Webinar: https://connectdot.connectsolutions.com/p81n6pqvvrh/ • Documenting Effective Uses of Project Scheduling Methodologies for Project Delivery Methods [in publication review] • Webinar: https://connectdot.connectsolutions.com/psotil8spjhe/ https://highways.dot.gov/research/

  13. FHWA Research • Construction Inspection for Digital Project Delivery [in publication review] • Webinar: https://connectdot.connectsolutions.com/pu7t81bsizsz/ • Analysis of Material Source Mergers and Acquisitions on Project Delivery Quality and Costs [in progress] • Quality Assurance Practices and Case Studies for Accelerated Bridge Construction (ABC) [in progress] • Use of Steel and Iron Materials in Highway Construction [in progress] • Assessment of FHWA Highway Project Cost Estimation Tools [in progress] https://highways.dot.gov/research/

  14. FHWA Research • Advanced Geospatial Tools for Highway Construction [report in publication process] • Webinar: https://media.oregonstate.edu/media/t/0_a80b5yqh • Bridge Preservation Actions: Developing a Decision Methodology [in progress] • Webinar: http://civil.colorado.edu/~hearn/FHWA/ • RAP Use in Asphalt Surface Treatment Construction [in progress] • Integrating 3D Digital Models into Asset Management [in progress] • Identifying Data Frameworks and Governance for Establishing Future BIM Standards [in progress] • Integrating BIM for Infrastructure Data into Highway Emergency Response [in progress] https://highways.dot.gov/research/

  15. FHWA Resource Center • Workshops: • Contract Administration for Claims Avoidance workshop • e-Construction and Partnering workshops • Project Closeout Mapping • Peer Exchanges: • Design-Build • Construction Manager/General Contractor • Scheduling • Utility Coordination Source: FHWA

  16. Thank You Be Safe!