1 / 1

PROJECT G.R.E.E.N.

PROJECT G.R.E.E.N. UNIVERSITY OF IDAHO, COLLEGE OF ENGINEERING. 556 tons/cycle. heat. Biomass Gasifier. THE BARN. DEMAND. PROJECT DESCRIPTION. LOCATED AT HORSETHIEF RESERVOIR (NORTH OF BOISE, ID). PROPOSING TO INSTALL A RENEWABLE ENERGY BASED SYSTEM TO MEET THE ENERGY

haracha
Download Presentation

PROJECT G.R.E.E.N.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROJECT G.R.E.E.N. UNIVERSITY OF IDAHO, COLLEGE OF ENGINEERING 556 tons/cycle heat Biomass Gasifier THE BARN DEMAND PROJECT DESCRIPTION • LOCATED AT HORSETHIEF RESERVOIR (NORTH OF BOISE, ID) • PROPOSING TO INSTALL A RENEWABLE ENERGY BASED SYSTEM TO MEET THE ENERGY • NEEDS FOR THE BARN, YMCA CAMP • EXPLORING AVAILABLE RENEWABLE POTENTIALS IN THE AREA • LEVERAGING RENEWABLE POTENTIALS FOR THE BENEFIT OF LOCAL COMMUNITY. ~6000 gallons @ 110oF 4 Hrs everyday for >4.5 years WIND • EDUCATION ASPECTS FOR CAMP PARTICIPANTS • CONSERVATION OF ENERGY • CONVERSION OF ENERGY • ECONOMICS • LOCAL HIGH-SCHOOL STUDENTINVOLVEMENT FOR WIND ASSESSMENT OF AREA • AVERAGE DAILY ENERGY CONSUMPTION ~ 313KWH • DEMAND CHARGES COSTING APPROXIMATELY 50% OF • UTILITY BILL Models suggests lack of wind HYDRO BIOFUELS/GEOTHERMAL SOLAR GENERATION • BARN ROOF DESIGNED FOR SOLAR PANEL INSTALLATION • SOUTH ORIENTED • LARGELY DEPENDENT ON AUTHORIZATION FROM FISH AND GAME • POSSIBILITY FOR PERIOD OF NO PRODUCTION DUE TO DRAINING OF RESERVOIR • 50 kWh/day • COVERS 16.0% OF THE BARN’S DAILY USAGE Wood-ash (By-product) Micro-Hydro Diversion Screen • Green-Houses • Effective in • Teaching the Food • Cycle • Encourages sustained • Farming • Promotes Camp’s Close to Nature’ idea • Benefits • Wood Ash from Gasifiers is a rich fertilizer • Smallest geothermal sites can sustain a greenhouse year-round in extreme conditions Micro-Hydro Generator Bank Fertilizer • REQUIRES 80 m2 OF ROOF SPACE WHICH IS AVAILABLE Cash Flow Diagram Horsethief Reservoir Spillway • Cascade Area • Spillway 1000+ gpm • Approximately 30ft. of head • 4 kW potential • Micro-Turbine Benefits • Low environmental impact • Educational in dispelling misconceptions • Round-the-clock generation Heat • Using Micro-Geothermal • Lower Demand Charges and Electricity Consumption • Future Expansion unaffected • Valuable Educational Tool for local community • EXISITING HOT WATER WELL 95F DISCOVERED IN 2006 • HIGH HOT WATER NEEDS • HIGH DEMAND CHARGES MENTORS/SPONSORS TEAM • YMCA - Horsethief Reservoir • Dr. Herb Hess, Ph.D., P.E. – Professor of Electrical and • Computer Engineering hhess@uidaho.edu • Rishabh Jain - Graduate Student, Electrical Engineering, Bio/Geo • Gage Gallagher - Student, Electrical Engineering, Solar • Matt Baker - Student, Electrical Engineering, Solar • Isaac Cowger - Student, Electrical Engineering, Hydro • Michael West - Student, Electrical Engineering, Wind

More Related