340 likes | 424 Views
El Chaguite Water System An Overview. Project Location: El Chaguite, Yoro District, Honduras Northeastern University’s Student Chapter. Guides. El Tecuan. Los Planes. Project Schedule. El Chaguite Existing System. Existing Conditions. Sufficient, clean water source Limited service
E N D
El Chaguite Water System An Overview Project Location: El Chaguite, Yoro District, Honduras Northeastern University’s Student Chapter Project: El Chaguite Water System
Guides Project: El Chaguite Water System
El Tecuan Project: El Chaguite Water System
Los Planes Project: El Chaguite Water System
Project Schedule Project: El Chaguite Water System
El Chaguite Existing System Project: El Chaguite Water System
Existing Conditions • Sufficient, clean water source • Limited service • Unusable distribution system • Damaged main line • Diverse topography • Hurricane damage • Fire damage Project: El Chaguite Water System
Current and Future Conditions Project: El Chaguite Water System
Design Details • Feasibility • Transmission Main • Distribution Network • Float Valve Tank • Sustainability Project: El Chaguite Water System 13
El ChaguitePopulation: 333 people Project: El Chaguite Water System
Overall Feasibility • Water Source : 15.52 gpm (22,348 gallons/day) • 25 year projected demand: 12,755 gpd +4,350 gpd (Irrigation use) 17,105 gpd • Diurnal Demand Cycle • Conclusion: Feasible with water storage tank Project: El Chaguite Water System
Design Process • Excel water flow model • WaterGEMS flow model • Multi-phase implementation • Phase 1 (COMPLETE) • Construct Transmission Main • Instruct villagers on construction of distribution system • Build break pressure tank (float-valve tank) • Phase 2 • Water storage tank • Inspect village-constructed distribution system Project: El Chaguite Water System
Transmission Main Source Proposed Tank Site Existing Tank Site Project: El Chaguite Water System 17
Transmission Main Project: El Chaguite Water System
Float Valve Tank Project: El Chaguite Water System 19
Alternatives Considered North Water Storage Tank East Water Storage Tank Project: El Chaguite Water System
Distribution System Model Project: El Chaguite Water System
El Chaguite Project: El Chaguite Water System
Transmission Main Project: El Chaguite Water System
Trench Detail Project: El Chaguite Water System
Trench Examples Project: El Chaguite Water System
Trip Schedule Project: El Chaguite Water System
Budget Project: El Chaguite Water System
Building Materials Project: El Chaguite Water System
Sustainability • Extra materials supplied for maintenance and replacement. • Locals will be educated on water conservation and proper system maintenance. • Water Board willcollect usage tax to fund future repairs. • Simple design and • construction Project: El Chaguite Water System 30
Community Ownership & Education • What kind of help will the community be providing? • Labor (digging trench, laying pipe, mixing cement, transporting materials). • We will coordinate a schedule of construction with El Chaguite’s Water Board. • Who will own the project once it’s completed? • El Chaguite will own the water system upon completion of the project. The El Chaguite Water Board will manage the communally used infrastructure. Project: El Chaguite Water System
Community Ownership & Education • Who will be overseeing maintenance once the team leaves and how will repairs be paid for? • El Chaguite’s Water Board will be overseeing the maintenance of the system. We will leave extra materials with the villagers to take care of any immediate necessary repairs. Hopefully, with improved health, the villagers will be able to establish community funds and pay for repairs further in the future. • What education will be provided to the community? • The community will be educated on the maintenance of the system, and we also plan to provide information about health and sanitation. In order for this to be a successful effort we will be working with the community Water Board and local organizations to ensure that the people understand the situation and are well informed about health and sanitation issues. Project: El Chaguite Water System
Project Lead Sign-Off • I, Daniel P. Saulnier, P.E., as the ProfessionalMentor of this project, have reviewed the technical and logistical contents of this project, and approve of the proposed design. I will also comply with TAC recommended changes and make suggested changes before traveling on the implementation trip. • Daniel P. Saulnier October 8, 2008 [signed] Project: El Chaguite Water System
Questions? Thank you for your attention. This slide concludes our formal presentation. Project: El Chaguite Water System