1 / 12

March 12 (Day 2, Sat) Hydrogen explosion at Fukushima plant

hasad-mckee
Download Presentation

March 12 (Day 2, Sat) Hydrogen explosion at Fukushima plant

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SESSION 2: Earthquakes, Tsunamis, Volcanos, OH MY!Moderator: Norm Fujisaki, Metron AviationSpeakers:Takeshi Imagome, Japan Civil Aviation BureauSigurdurHolmarJohannesson, ICEATCAMark Libby, FAAJohn O’Sullivan, Harris CorportationJoe Sultana, EUROCONTROLJason Tuell, NOAAText Questions to 703-609-8481

  2. March 12 (Day 2, Sat) • Hydrogen explosion at Fukushima plant • Evacuation order 20km radius of the plant • Global Hawk mission

  3. March 13 (Day 3, Sun) • U-2 dispatched • USS Reagan March 14 (Day 4, Mon) • Hydrogen explosion at Fukushima plant • Stand-off area 30km radius

  4. March 15 (Day 5, Tue) • No-fly zone 30km radius of the Fukushima plant • Yamagata, Hanamaki & Fukushima 24hr airlift March 16 (Day 6, Wed) • RJSS open for relief airlift • C-130 landed (1st fixed wing a/c since 3/11) YAMAGATA

  5. March 17 (Day 7, Thu) • Traffic advisory service commenced • JGSDF CH-47 dropped water on the nuclear plant March 18 (Day 8, Fri) • ICAO & IATA press released “No Restrictions on Travel to Japan”

  6. March 22 (Day 12, Tue) • To support night airlift, runway lights installed 1,500m of Rwy27/09 • Traffic advisory service extended to 24hrs

  7. March 24 (Day 15, Thu) • Japanese UAS used to survey the nuke plant (2.2m/2.8m/16kg) March 31 (Day 21, Thu) • Traffic advisory service moved to mobile tower

  8. JCAB opened English web page www.mlit.go.jp/koku/flyjapan_en/ to timely update info on radiation dose, ops status etc of major airports in Japan

  9. April 7 (Day 28, Thu) • Last relief airlift by US Forces left RJSS April 8 (Day 29, Fri) • Last int’l relief team left the area

  10. April 13 (Day 34, Wed) • ATC (TWR, GND, ATIS) resumed • 1st inbound (JAL4721, B737 from Haneda) arrived at 8AM

  11. Takeshi Imagome imagome-t43s3@mlit.go.jp

  12. SESSION 2: Earthquakes, Tsunamis, Volcanoes,OHMY!Moderator: Norm Fujisaki, Metron AviationSpeakers:Takeshi Imagome, Japan Civil Aviation BureauSigurdurHolmarJohannesson, ICEATCAMark Libby, FAAJohn O’Sullivan, Harris CorportationJoe Sultana, EUROCONTROLJason Tuell, NOAAText Questions to 703-609-8481

More Related