250 likes | 404 Views
Global Programme for Sustainable Ship Recycling Dhaka 12 – 13 th January 2008 Mark Gilligan Golder Associates. THANK YOU. Introduction to H&W, Golder Associates. LOCATION OF SITE & FACILITIES. H&W Belfast. Northern Ireland. Europe. WHY?. HOW?. Direct Sea Access.
E N D
Global Programme for Sustainable Ship Recycling Dhaka 12 – 13th January 2008 Mark Gilligan Golder Associates
Introduction to H&W, Golder Associates.
LOCATION OF SITE & FACILITIES H&W Belfast Northern Ireland Europe
Direct Sea Access PLAN OF SITE & FACILITIES Repair Dry Dock Main Dry Dock Fabrication Halls Photograph January 2005
PLAN OF SITE & FACILITIES Photograph January 2005
GANTRY CRANES • 2 x 840 tonne SWL • Span 140m • Lifting height 80m • Loading / offloading directly from sea. • Combined lifting capacity of 1600 tonnes.
MULTI-WHEEL TRANSPORTERS • 400 Tonne • 250 Tonne • 75 Tonne
BUILDING / CONVERSION DOCK • 556m x 93m • 7m Draft • Intermediate dock gate - at set locations along the length of the dock.
SHIP REPAIR DOCK • 335m x 50.29m • 12.2m draft above the blocks • Slops reception / Permit • TBT paint removal • Open grit blasting
Golder Associates More than 150 countries More than 6,500 staff globally More than 12,000 projects each year Engineering solutions since 1960
Golder Associates Locations and Staff Distribution 2008 Canada 2650 Europe 850 USA 1250 Asia Pacific 900 South America 600 South Africa 250 More than 6,500 people, 144 offices, 6 continents
Golder’s Market Breadth Land Development Transportation Water Resources Manufacturing Mining Oil & Gas Agriculture & Forestry Power Waste E.D.D. (Finance)
Global Demolition Team :Full range of sectors Oil Refineries Chemical Plants Breweries Residential Marine Vessels Offshore Airports Hospitals Post-conflict / Disaster Silos
Certification and Licenses H&W has a ‘Waste Management Licence for the Dismantling of Marine Vessels and Marine Structures’ H&W has operational planning permission for ‘…ship and marine structure…dismantling,’ H&W’s Quality Management System is ISO 9001:2000 accredited
Leading Edge: Ship Recycling MSC Napoli Onshore decontamination and dismantling of the forward section (11,300t) Accelerated onshore recycling within strict UK regulations and legislation on H&S, waste management and environmental control. Sound and auditable solution for client’s liabilities.
Leading Edge: Ship Recycling MSC Napoli
Leading Edge: Ship Recycling MSC Napoli
MSC Napoli LeadingEdge:ShipRecycling
The H&W – Golder Associates Solution: “To provide vessel owners with a sound, environmentally beneficial and cost effective solution to their assets and liabilities”
THE NEXT STEP Harland and Wolff Golder Associates V Navy
CONTACT INFORMATION Harland & Wolff HI Ltd Queens Island Belfast Northern Ireland Lawrence Cobain TEL: +44(0)2890 534389 FAX: +44(0)2890 534027 LawrenceC@harland-wolff.com Golder Associates (UK) Ltd Carnmoney House Edgewater Road Belfast Mark Gilligan TEL: +44(0) 7770 803575 FAX: +44(0) 2890 787770 mgilligan@golder.com