An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ATC Update W. Shannon Black Chair, WECC MIC MIS ATF TF

  2. Almost There • Passed • MOD-01 Umbrella 76.83% • MOD-08 Transmission Rel. Mar. 81.49% • MOD-29 Rated System Path 92.24% • MOD-30-1 Flowgates 1 74.26% • Pending • MOD-04 Cap. Ben. Margin 66.29% • MOD-30-2 Flowgates 2

  3. Let’s Make a Deal • MOD-30-1 and MOD-30-2 • Flowgates • Small concession was needed in Version 1 • Version 1 was released for vote to meet time line • Approved • Version 2 is in progress • Incorporates changes needed by WECC members • Version 2 forwarded to NERC for pre-ballot review / posting • Target to respond to comments on Jan. 9, 09. • WECC Team Recommendation • “YES” on MOD-30-2

  4. So Close! • MOD-04-1 Capacity Benefit Margin • Quorum: 79.26% • Approval: 66.29% • Small changes were made for the NE • Clarified language describing time windows • Should swing the vote • Forwarded to NERC Standards Committee • Request approval for Recirculation Ballot • WECC Recommendation • Next ballot – say “YES” • As drafted CBM is an “option” • “YES” protects that option

  5. Implementation • In excess of a year out • FERC actions to watch for • Needs to be approved • Will likely issue a NOPR to figure out • “How to implement” • “How to ensure the same numbers” • Get ahead of the game • Create a model template for the “Implementation Documents” et al • WestConnect? • MIC? • MIS?

  6. Questions?

  7. Frequency Response Reserves(FRR Update) W. Shannon Black Chair, WECC FRR Drafting Team

  8. What’s Happening? • Board (June 08) • Draft a “standard” • Standard Drafting Team (July 08) • Convened • Looked at the evidence (Sept. 08) • 11 Pro criterion / 0 Con criterion • Concluded a “standard” was not warranted based on the evidence • Concluded a “criterion” was warranted

  9. What Didn’t Change? • The FRR SDT agrees with the 2005 White Paper • Must ensure the future adequacy of FRR response. • Response must include • Primary response (0-30 seconds) after excursion • Secondary response (post 30 seconds) • Sustained for 15 minutes or until a return to 59.9 Hz - whichever comes first.

  10. Why Change Course? • 2005 Technical Team !!EXCELLENT JOB!! • Did an excellent job with the data they had • 2005 data was flawed • Laced with interpolation • Not everyone reported data • Wasn’t apples to apples • The data reported was not in synch • The 2005 Team took what they had and force fitted the data to match • Some reported data at 4 seconds, some 6 seconds • Some archived at 6 seconds, some 20 seconds • Data from dynamic schedules was often delayed obscuring the actual response

  11. Why Change Course? • 2005 data was more limited than today • 2002-2004 showed the frequency responsetrend was up! • BUT… • 2005 showed a downward trend! • 2006 the trend was up! • 2007 the trend was down! • 2008 the jury is out

  12. Why Change Course? • Get it right! • If the data was flawed • So to the answer • Penalties could be imposed for the wrong reasons • Test it • Draft the criterion • Test it against / with actual data • Morph into standard later if appropriate

  13. Calendar Highlights • 10/27/08 First draft / Post for 45 days • 11/14/08 Workshop 1 for Q and A • 12/11/08 Close Comments • 12/18/08 Answer Comments • 12/22/08 Post revised criterion for 30 days • 1/14/09 Workshop 2 for Q and A • 1/09-5/1/09 “Process” as needed • 6/09 OC votes • 7/09 Board votes

  14. Basic Features of Current Draft • Set the amount • Greater of • 2800 (or) • Two largest credible generator (G-2) outages at one generating plant • Communicate the amount • Annually to the BAs and RSGs • BA / RSG • Calculates it share of the overall • Function of generation AND load • Provides Primary and Secondary FRR response • Primary: 0-30 sec /Governors • Secondary: 30 sec to 15 minutes or until return to 59.9 Hz /AGC

  15. Basic Features • The criterion • Does not • Dictate “how” the provision is to be made • Does • Dictate the response must be provided • How that response will be measured • How often the measurements are shared

  16. Questions?