1 / 8

AS9104-3 Report July 20, 2011 Boston, MA

AS9104-3 Report July 20, 2011 Boston, MA. Team Members. Will Tate (TL), Triumph Aerostructures – Vought Aircraft Division Shanya Salamaca Rick Downs, Cessna-Textron Vince May, Honeywell Ian Folland Tony Marino, Boeing Ian Dummigan Dominique Thiault Lisa Greenleaf

hedia
Download Presentation

AS9104-3 Report July 20, 2011 Boston, MA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AS9104-3 ReportJuly 20, 2011Boston, MA

  2. Team Members • Will Tate (TL), Triumph Aerostructures – Vought Aircraft Division • Shanya Salamaca • Rick Downs, Cessna-Textron • Vince May, Honeywell • Ian Folland • Tony Marino, Boeing • Ian Dummigan • Dominique Thiault • Lisa Greenleaf • Jeffery Long, UTC (Pratt & Whitney) • Reg Blake, IAAR • Shuji Komori • Giuseppe Leoni • Kimberly Maggie

  3. Auditor Authentication Process

  4. AA Authentication • 4 audits comprising 20 on-site auditor days QMS/AQMS audits 2 audits may exclude design (7.3) • QMS Lead Auditor course • AQMS Foundation Course • Audit Competency Demonstration • AEA Authentication • 4 audits comprising 20 on-site auditor days QMS/AQMS audits 2 audits may exclude design (7.3) • QMS Lead Auditor course • AQMS Foundation Course within 3 yrs • 2/10 years ASD experience minimum • Technical Competence evaluated by CB/AAB approved by SMS • Auditor Competency Demonstration

  5. AA AEA Expansion • 300 on-site audit days of an AQMS in 5 yr or 500 on-site audit days of an AQMS in 10 yr • Technical Competence evaluated by CB/AAB approved by SMS • Auditor Competency evaluation • Re-authentication in 5 yrs • Re-authentication • Every 5 yrs • Same criteria is initial authentication • Attendance at one SMS auditor workshop during re-authentication period • Decision made by AAB • Suspension / Withdrawal • Not fulfilling AS9104-1/3 reqmts • AQMS authentication contains false info • Falsified audit findings • Actions that would bring ICOP into dispute • Not informing AAB of a previous rejection, suspension, or withdrawal from another AAB • Decision for suspension, AAB will determine conditions of suspension

  6. Additional Requirements contained within AS9104/3 Draft • Training Provider Requirements • TPAB Requirements • Record retention requirements • Training Courses requirements • Requirements for training instructors • AAB requirements • Guidance on assessment Principles and Practices

  7. Next Steps • Convene team 2 -3 times prior to next IAQG meeting • address open issues • clarify /include relevant feedback • Complete handoff to new Team leader • Detailed presentation to AAQG/RMC in Long Beach (Sep) • General feedback from Sectors after IAQG meeting

  8. Questions and Thoughts

More Related