1 / 44

FE Review for Environmental Engineering

FE Review for Environmental Engineering. Problems, problems, problems Presented by L.R. Chevalier, Ph.D., P.E. Department of Civil and Environmental Engineering Southern Illinois University Carbondale. FE Review for Environmental Engineering. Mathematical/Physical Foundations.

hedwig
Download Presentation

FE Review for Environmental Engineering

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FE Review for Environmental Engineering Problems, problems, problems Presented by L.R. Chevalier, Ph.D., P.E. Department of Civil and Environmental Engineering Southern Illinois University Carbondale

  2. FE Review for Environmental Engineering Mathematical/Physical Foundations

  3. Complete the following chart:

  4. Review the definitions of • TS • TDS • TSS • VDS • FDS • VSS • FSS • Assume a 1 liter sample • Divide 700 mg by the percentage shown or calculated

  5. Complete a flow chart using the following information

  6. Review definitions • Fixed mean inorganic – it does not burn • Volatile means organic – it does burn

  7. Sodium chloride 45 mg/L Dissolves Doesn’t volatilize 45 45 45

  8. Calcium sulfate 30 mg/L Dissolves Doesn’t volatizes 45 30 45 30 45 30

  9. Clay 100 mg/L Doesn’t dissolve Doesn’t volatizes 45 30 100 100 45 30 100 45 30

  10. Copper chloride 10 mg/L Dissolves Doesn’t volatizes 45 30 10 100 45 30 10 100 45 30 10 100

  11. Acetic acid 20 mg/L Dissolves Volatizes 45 20 30 10 100 45 20 30 10 100 45 30 10 20 100

  12. Coffee grounds 25 mg/L Doesn’t dissolves Volatizes 45 20 30 10 100 25 45 20 30 10 100 25 20 45 30 10 25 100

  13. Water flows into a heated tank at a rate of 150 gal/min. • Evaporation losses are estimated to be 2000 lb/hr. • Assuming the tank volume to be constant, what is the flow rate out of the tank?

  14. Draw a schematic (control volume) • Convert to like units (Weight of water 8.34 lb/gal) • Mass in = Mass out • concept of density (Volume in = Volume out) 2000 lb/hr 150 gpm ?

  15. Consider the following report from three supplies into a reservoir. Is it correct?

  16. Do you see a problem here?

  17. Important Rule: We can add mass (mass balance) but not concentrations X

  18. 1. What is the total volume of water per day? 140 gpm + 5 gpm + 5 gpm = 150 gpm Converting to liters/day (L/d) (150 gpm)(3.785 L/gal)(60 min/hr)(24 hr/day) = 817560 L/d

  19. 2. What is the mass from source B? (5 gpm)(3.785 L/gal)(500 mg/L)(60 min/hr)(24 hr/d) = 1.36 x 107 mg/d Converting to ppm per day in total water 1.36 x 107 mg/ 817560 L = 16.67 mg/L = 16.67 ppm

  20. 3. What is the mass from source C? (5 gpm)(3.785 L/gal)(500 mg/L)(60 min/hr)(24 hr/d) = 1.36 x 107 mg/d Converting to ppm per day in total water 1.36 x 107 mg/ 817560 L = 16.67 mg/L = 16.67 ppm

  21. 4. Therefore, we have 16.67 ppm benzene, and 16.67 ppm toluene! Not 1000 ppm! 5. Can we add these concentrations?

  22. Simple Model Of Stream Pollution Based On Mass Balance Qe Ce Industrial Complex Qu Cu Qd Cd

  23. A factory for copper and brass plating is dumping its wastewater effluent into a near-by stream. • Local regulations limit the copper concentration in the stream to 0.005 mg/L. • Upstream flow in stream, 0.5 m3/s. Concentration of copper in upstream flow is below detection limits • Effluent flow from plating factory 0.1 m3/s • Determine the maximum concentration allowable in the effluent from the factory’s wastewater.

  24. Draw a control volume diagram • Determine Qtotal = Qstream + Qeffleuent • Convert concentrations to mass (mass flux) • Use mass balance to determine the allowable concentration (based on mass) of effluent

  25. Qe =0.1 m3/s Ce = ? Industrial Complex Qd = ? Cd = 0.005 mg/L Qu= 0.5 m3/s Cu = 0 mg/L

  26. ....end of example

  27. SIMPLE PHOSPHOROUS MODEL Want to estimate the amount of phosphorous control needed to prevent eutrophication due to the over-production of algae

  28. Simple Phosphorous Model • Completely mixed lake • Steady state • Constant settling rate • Phosphorous is the controlling nutrient Assumptions:

  29. Schematic Of System Waste water treatment plant Q = 0.2 m3/s P=5.0 mg/L Stream Q = 15.0 m3/s P=0.01 mg/L Settling rate vs = 10 m/yr Surface area of lake 80 x 106 m2

  30. Estimate P • What rate of phosphorous removal at the wastewater treatment plant would be required to keep the concentration of phosphorous in the lake at an acceptable level of 0.01 mg/L?

  31. Evaluate all inputs and outputs to the control volume • Qin = Qout • QCin = QCout

  32. Using mass balance approach:Rate of addition of P = Rate of removal of P Sources QwwtPwwt QstreamPstream

  33. Using mass balance approach:Rate of addition of P = Rate of removal of P Outflow rate, QtPlake Area, A Concentration, Plake Settling rate, AvsPlake

  34. Rate of addition of P = Rate of removal of P S = QTPlake+ vsAPlake where: S = rate of addition of phosphorus from all sources (g/s) P = concentration of phosphorus (g/m3) QT= stream outflow rate (m3/s) vs= the phosphorus settling rate (m/s) A = surface area of the lake (m2)

  35. which results in a steady-state concentration of Of note, vs is empirically derived and difficult to predict with any confidence. Suggest a settling rate of 3-30 m/year.

  36. 1. Determine the mass loading from both sources Phosphorous loading from incoming stream: Ss = (15.0 m3/s)(0.01 mg/L)(g/1000mg)/(1000 L/m3) = 0.15 g/s From the wastewater treatment plant: Sw = (0.2 m3/s)(5.0 mg/L)(1 g/m3)/(mg/L) = 1 g/s For a total loading of S = 0.15 g/s + 1.0 g/s = 1.15 g/s

  37. 2. Determine the volume (mass) of water entering over time: Neglecting evaporation QT= 15 m3/s + 0.2 m3/s = 15.2 m3/s 3. Estimate the settling rate:

  38. 4. Apply model This is above the 0.01 mg/L suggested for acceptable concentration. We cannot reduce background levels in the stream. Therefore, we need to determine the reduction at the plant. To start with, solve for S with a known value of P = 0.01 mg/L

  39. The amount that the wastewater treatment plant could contribute would be: Sw = 0.41g/s – 0.15 g/s = 0.26 g/s Since Sw is now at 1.0 g/s, there is a need for 74% phosphorous removal

  40. Summary of Problem • We basically did a mass balance for • the water supply • the contaminant where M4 is the mass in both the lake and the outgoing stream Q1 M4/T=M1/T+M2/T-M3/T M1/T Q3=Q1+Q2 M2/T M3/T (settling) Q2