An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Workshop – August 27, 2007 Lunenburg Comprehensive Wastewater Management Plan Phase II – Management Techniques and Alternatives Identification and Screening

  2. CWMP Phases • Project Management/Public Involvement • Phase I - Existing Conditions (filed May 2007) • Phase II - Alternatives Identification and Screening • Phase III - Detailed Evaluation of Alternatives and Recommended Plan • Phase IV – Report

  3. Phase I CWMP Summary • Existing conditions • Water demand/supply sources • Lunenburg Water District • Water balance • 3 local sub basins of the Nashua River • Wastewater needs assessment • 11 Areas of Further Study

  4. CWMP Phases • Project Management/Public Involvement • Phase I - Existing Conditions • Phase II - Alternatives Identification and Screening • Phase III - Detailed Evaluation of Alternatives and Recommended Plan • Phase IV - Report

  5. Phase II - Alternatives Identification and Screening • Proposed Alternatives • Collection • Treatment • Effluent Disposal • Review Criteria • Technical • Environmental • Institutional • Economic

  6. Phase II CWMP • Review wastewater management alternatives • Identify and short list potential wastewater treatment and effluent disposal sites • Provide short list of treatment, collection and effluent disposal alternatives

  7. Draft Phase II report • Section 1 – Introduction • Section 2 - WW Management Alternatives Reviewed as Tech Memo #1 • Section 3 - Potential Treatment/Disposal Site Locations Reviewed as Tech Memo #2 • Section 4 - Short Listed Alternatives • Section 5 – Assessment of Management Techniques • Section 6 - Public Participation

  8. Technical Memorandum #2 • Potential wastewater treatment and effluent disposal sites • To be used if a decentralized treatment process is part of the recommended plan • Townwide search identified 23 potential sites • Performed preliminary hydrogeological evaluation • Soils, depth to bedrock, and effluent disposal rates • Short listed 9 sites by sub basin • Based on 11 technical and environmental factors

  9. Questions and Comments

  10. How is Lunenburg Wastewater Disposed of Now? • Individual on-site systems (Title 5) • Innovative/Alternative (I/A) on-site systems • Jet System • Presby • FAST • Private satellite systems • Village at Flat Hills • Woodlands Village • Sewer connections – regional/centralized • Leominster • Fitchburg

  11. Types of Wastewater Systems • Individual On-Site • Title 5 • Septic tank/leach field I/A On-Site Systems

  12. Types of Wastewater Systems Satellite -- Defined service area, GWD permit Village at Flat Hill

  13. Types of Wastewater Systems Satellite -- Defined service area, GWD permit Woodlands Village

  14. Types of Wastewater Systems • Centralized - Traditional municipal facility Fitchburg East WWTF

  15. Types of Wastewater Systems • Centralized - Traditional municipal facility Leominster WWTF

  16. 956 planned units 1,579 additional residents per EOEA projections 3,555 existing units 2025 EOEA Projection 11,133 Existing Planned Developments Population Projections 2005 Actual: 9,554 Basis for 2026 Projected Flows

  17. Types of Wastewater Systems • Centralized Systems • Publicly owned and operated • Decentralized Systems • Individual on-site • Cluster • Satellite • Typically privately owned and operated

  18. Proposed Alternatives - Treatment • Off-site • Regional solutions • Centralized treatment • Satellite systems • On-site • Cluster • Continued use of on-site systems • Title 5 • I/A Systems • Septage Management Plans