380 likes | 393 Views
Operators obligated to submit monthly data to Petroleum Registry for regulatory compliance must ensure accuracy. Utilize tools like Validation Results and Non-Compliance Report. Stay informed to avoid errors and penalties.
E N D
The Petroleum Registry of AlbertaEnergizing the flow of information Training Session September 27, 2004
Confirming data is accurate and complete • Facility operators are required to submit data monthly to the Registry to meet Regulatory and Royalty reporting requirements. • Facility operators who do not submit accurate and complete data by the applicable deadlines will be subject to: • EUB Non Compliance fees • DOE Gas Royalty Provisional Assessments
Confirming data is accurate and complete (con’t) • The Registry has various tools and/or processes designed to assist facility operators meet their mandatory reporting requirements. • Four of these items are: • Validation results detailing data entry/submission errors • EUB Non Compliance report • SAF/OAF Ensure Complete report • Allocation – Variance report
Validation Results • On line keying and submitting of monthly data provides on screen messages concerning errors. • On screen error messages should be reviewed and data corrected and resubmitted.
Validation Results (con’t) • Batch submissions of files indicate on screen whether the file has been accepted or not for processing. • A file accepted for processing may contain errors as the data within has not yet been validated.
Note: Please record the incoming file key for reference if you have a problem and need to contact the service desk.
Validation Results (con’t) • The validation results must be reviewed to confirm data was processed error free. • Validation Results notifications are emailed to the submitter as well as, stored in the BA Registry In-box. • Each type of monthly data has two potential validation result email notifications • Validation Results – Failure • Validation Results – Success
Validation Results (con’t) • Failure means the all or a portion of the data in the file was rejected and not recorded in the Registry. • Failure notifications should always be opened. The notification will detail by row/line the errors encountered during processing of the file. • Corrections should be made and the file resubmitted.
Validation Results (con’t) • Volumetric and Pipeline Split successful notifications mean that all the data in the file was processed and recorded in the Registry. • Allocation successful notifications mean that the allocation(s) was processed and recorded in the Registry but it may contain warning messages related to the allocation(s). • Successful Allocation validation result notifications must always be opened and reviewed to confirm there are no warning messages i.e. Invalid Stream or Owner ID.
EUB Non Compliance Report • Identifies errors and/or missing volumetric data required to be in the Registry prior to the EUB filing deadline. • Consists of two parts, summary and detail information • Both are available in PDF format while the summary is also available in CSV format.
EUB Non Compliance Report (con’t) • Is created in three ways: • Registry auto created warning • Registry auto created final • Online by request (anytime)
EUB Non Compliance Report (con’t) • Registry auto created warning: • available in your Registry inbox the morning of the day before the EUB deadline. • Identifies all volumetric errors and omissions that require correction prior to the EUB deadline.
EUB Non Compliance Report (con’t) • Registry auto created final: • available in your Registry inbox the day after EUB deadline. • Identifies all volumetric errors and omissions that may receive penalties on the EUB Volumetric Deficiency Invoice. • Refer to the Registry TIP – Monthly Reporting Volumetrics– EUB Non Compliance fees related to Registry error messages.
EUB Non Compliance Report (con’t) • Online by request: • Allows operators to determine if the EUB’s filing requirements for specific facilities are being met. • Allows operators to identify and correct errors prior to the EUB deadline. • This report can be requested at anytime.
EUB Non Compliance Report (con’t) • EUB Non Compliance report upcoming changes: • Release 4.4 November 3, 2004 • New Button – All Users current facility assignments (VI 9152) • All Operated button – will now include facilities previously but not currently operated as well as those currently operated by the BA (VI 7978)
EUB Non Compliance Report (con’t) • Three (3) Different notifications and report names (VIs 13685 & 13631) • Auto Created Warning report – 2 days before deadline • Auto Created Final report – on/at the deadline • On request - anytime
EUB Non Compliance Report (con’t) New button
SAF/OAF Ensure Complete Report • Identifies invalid, incomplete or missing SAF and OAF submissions • Only includes volumetric activities, SAFs and OAFs associated with gas and by-product Crown Royalty triggers
SAF/OAF Ensure Complete Report (con’t) • Is created in three ways: • Registry auto created • DOE auto created • Online by request (anytime)
SAF/OAF Ensure Complete Report (con’t) • Registry auto created: • Registry automatically runs an Industry: SAF/OAF Ensure Complete Report – Warning two days prior to “cheque exchange”. • Run against royalty triggers only • Objective is have all allocations in place for partners to view in the Registry by “cheque exchange”.
SAF/OAF Ensure Complete Report (con’t) • DOE auto created: • The DOE automatically creates an Industry: SAF/OAF Ensure Complete Report – Warning two days prior to the DOE deadline. • Run against royalty triggers only. • Identifies potential problems that could result in a Provisional Assessment for crown royalties. • The report is created in the DOE gas royalty system and posted in Ministry Invoices and Statements section in the Registry.
SAF/OAF Ensure Complete Report (con’t) • Online by request: • Facility operator can request the Registry to run this report for operated facilities. • It is used to ensure all royalty trigger allocations (SAF and OAF) submissions are valid and complete. • This report can be requested at anytime.
SAF/OAF Ensure Complete Report (con’t) The All Assigned button includes those facilities assigned to the requesting user by the BA’s user security administrator (USA).
Allocation - Variance Report • This report shows the variance between stream/owner volumes submitted for allocations and the total volume reported for volumetrics • Available in summary and detail format • Should be reviewed to confirm submitted volumes match the calculated volumes. • A tool to identify instances where the net volumes created in your internal system (submitted volumes) does not match the Registry calculated volumes.
Summary/Wrap up • Focus Items for Operators: • How to confirm data is submitted with no errors – Validation results. • How to avoid EUB Non Compliance fees – EUB Non Compliance report. • How to avoid DOE gas and by product crown royalty provisional assessments – SAF/OAF Ensure Complete report. • How to identify variance between submitted and calculated allocation volumes and/or energy – Allocation Variance report.
Summary/Wrap up (con’t) • Your comments are appreciated to assist in future training sessions. • If you have any questions or comments about the content of this presentation, please email them to:petroleumregistry.energy@gov.ab.ca • or fax them to us at 297-3665.