SLO – GIS User’s Group Airports GIS (AGIS) September 8, 2011 Matt Cunningham, PLS Aviation Division Manager

SLO – GIS User’s Group Airports GIS (AGIS) September 8, 2011 Matt Cunningham, PLS Aviation Division Manager. Discussion Items. Airports GIS: Brief History NextGen Why AGIS? Survey and Data Standards AGIS Implementation ALP vs. eALP Comparison. AGIS History. No FAA standards for GIS

heman
Download Presentation

SLO – GIS User’s Group Airports GIS (AGIS) September 8, 2011 Matt Cunningham, PLS Aviation Division Manager

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SLO – GIS User’s GroupAirports GIS (AGIS)September 8, 2011Matt Cunningham, PLSAviation Division Manager

  2. Airports GIS

  3. Discussion Items Airports GIS: Brief History NextGen Why AGIS? Survey and Data Standards AGIS Implementation ALP vs. eALP Comparison atgeosys.com

  4. AGIS History • No FAA standards for GIS • Disparity in data management techniques • No common coordinate system • Large volumes of spatial data in paper form • No common data format • Many airports with no spatial data management system in place • Need for a standardized data collection and management system Atgeosys.com

  5. NextGen Goals • Comprehensive overhaul of National Airspace System • Move to Satellite-Based navigation from current Land-Based navigation • Enhance Safety • Reduce environmental impacts related to aviation • Enhance the flow of information • Make air travel more predictable – reduce delays • Make better, more informed infrastructure decisions Atgeosys.com

  6. Why AGIS & NextGen? Airports GIS

  7. Create a national database of spatial data related to aviation • Create a central repository for all spatial data • Reduce work redundancy • Standardize Data • Data acquisition • GIS schema • Imagery • Geodetic Control Atgeosys.com

  8. Survey Standards • FAA AC 150/5300-16,-17,-18 & soon to be -19 • Geodetic Control – PACS & SACS • Imagery and Ground Surveys • Statement of Work (SOW) • FAA & NGS review of SOW • Perform field work – data collection • Testing of Survey data prior to submittal • FAA & NGS data review & acceptance • Handheld Mapping Grade GPS • Remote Sensing Atgeosys.com

  9. Truckee-Tahoe Airport Aerial Topographic Survey Compiled from Imagery with 0.25’ max pixel resolution. Airports GIS

  10. Data Standards • Drawing Set-up & Data Preparation – GIS vs CAD • FAA Standard Layers, Feature Classes and Attributes • Metadata requirements • Workflow validation & acceptance • Validation Errors report • Validation Summary report • ESRI ArcGIS, Autodesk and Microstation data format • Aerial Imagery Atgeosys.com

  11. How Does AGIS Work? • Airports submit and own data • FAA hosts the data on their servers • Airports manage the data • AGIS is web-based – no airport-based GIS needed • Airports can access their data via AGIS web portal • NGS provides the quality control for the safety critical data • GIS data submittal is a requirement for new construction projects with FAA funding. • Data is not available to the general public. Atgeosys.com

  12. How Does AGIS Help to Meet NextGen Goals? Safety- • Higher quality data for obstructions • Higher quality data for NAVAIDS • Standardized data requirements for airport operations areas and safety critical equipment • More efficient way to share data • Makes it possible to put airport spatial data in the cockpit • Data can be used in Part 139 Inspections • Develop eNOTAM’s • Reduces chances of CFIT’s • Reduces runway incursions or collisions Atgeosys.com

  13. How Does AGIS Help to Meet NextGen Goals? Satellite-Based Navigation • Provides the data of all airports in a common coordinate system • Data can be used in developing National Flight Procedures • NFDC info can be integrated • Airspace and Obstruction Analysis data • Data suitable for developing Precision Instrument Approach procedures Atgeosys.com

  14. How Does AGIS Help to Meet NextGen Goals? • AIP funds to facilities with highest needs • Tighter plane separations • More planes in same airspace • Less fuel consumed by planes • Fewer delays in commercial flights • More direct routing • Improved flexibility of operations & procedures Atgeosys.com

  15. AGIS Implementation • 2008 National AGIS Team created • 3 Phases to AGIS deployment • 2009 - Southwest region - Six airports, plus Atlanta Hartsfield • 2010 - Remaining Regions – 30 Airports • 2011-2025 – Incremental Projects – Phasing considered • 2010-11 eALP beta-tests • 2012 eALP v1.0 Deployment Atgeosys.com

  16. ALP vs. eALP • All NPIAS airports req’d to have an ALP • Paper copies housed at multiple locations • Paper ALP’s often have conflicting info • NextGen needs real-time web-based access of the same version of doc’s Atgeosys.com

  17. Truckee-Tahoe Airport Phase 1 of FAA-Compatible GIS Airports GIS

  18. SLO – GIS User’s GroupAirports GIS (AGIS)September 8, 2011Matt Cunningham, PLSAviation Division Manager(805) 781-9296matt@atgeosys.com