G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls

G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls. Princeton Plasma Physics Laboratory NCSX PDR 5/22/02 Princeton NJ 08543. WBS 5 Project Elements. WBS 51 TCP/IP network Infrastructure WBS 52 Central Facilities I&C

hertz
Download Presentation

G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma Physics Laboratory NCSX PDR 5/22/02 Princeton NJ 08543 G. Oliaro 1

  2. WBS 5 Project Elements • WBS 51 TCP/IP network Infrastructure • WBS 52 Central Facilities I&C • WBS 53 Diagnostic Data Acquisition and Facility Computing • WBS 54 Facility Timing and Synchronization • WBS 55 Real Time Plasma and Power Supply Control System • WBS 56 Central Safety and Interlock System • WBS 57 Control Room Facility G. Oliaro 2

  3. Primary Design Basis of WBS 5 • The NCSX Design Leverages the NSTX Technology and Experience Base and Provides a Low Risk - Cost Effective Implementation. • Commercial-Off-The-Shelf (COTS) • Maximize Use of Open Source (Free) Software • Just-In-Time Design & Purchase • Steer Current NSTX Upgrades to Benefit NCSX • Network • CAMAC Replacement to CPCI & PCI • Synchronization System • Plasma Control (FIMM) • CAMAC Instrumentation Will Not Be Used In Design G. Oliaro 3

  4. WBS 51TCP/IP network Infrastructure • Common Backbone For All NCSX Data Communications • Minimum 100Mbps with possible 1Gbps uplinks • Cost Base • Experience Base • Use existing PPLnet backbone for Physics requirements • Extend existing NSTX Engineering Network to lower costs • Utilize existing firewall protection for Engineering network • Provide Fiber Optic network infrastructure for machine platform environment • Provide a total of 12-24 new day 0 network drops for NCSX Facility at D-Site and C-Site G. Oliaro 4

  5. WBS 51TCP/IP network Infrastructure • Hub and Fiber Patch Point modifications in 5 PPPL Locations • D-Site FCPC, D-Site MG, C-Site S1, C-Site NCSX Control Room, PPLCC, and NSTX Control Room • Use Existing Network C-Site to D-Site Fiber Optic Runs • Share Engineering Subnet with NSTX to Allow Seamless Sharing of Common Resources • 2X60 fibers C-Site/D-Site for Plasma Control/Utility I&C, Timing and Synchronization • 96 Diagnostic Fiber Optic Cables Between Test Cell and Control Room G. Oliaro 5

  6. WBS 52Central Facilities I&C • Experimental Physics and Industrial Control System (EPICS) Distributed Control System (DCS) • Well Established World Wide User Community • Multi-Platform & OS Base • Scales to hundreds of thousands of points • Multiple I/O Capability • PLCs • Native EPICS Input Output Controller (IOC) • VME, PCI, CPCI, … • Interfaces to • Standard DCS Capabilities • Trending • Alarms & Alarm Logging • Graphical Mimics, Control & Monitoring G. Oliaro 6

  7. WBS 52Central Facilities I&C • NCSX/NXTX EPICS Parameter Comparison G. Oliaro 7

  8. WBS 52Central Facilities I&C • Support for 5 Day 0 Engineering Subsystems • WBS 21 Fueling Systems • WBS 22 Vacuum Pumping Systems • WBS 43 Magnet Power Systems • WBS 62 Water Systems • WBS 63 Cryogenic Systems • Support for additional Subsystems after 1st year • WBS 23 First Wall Conditioning, Thermocouples for Bakeout, GDC • WBS 24 RF Heating Systems, ICH • WBS 25 Neutral Beam Heating Systems • WBS 42 Motor Generators G. Oliaro 8

  9. WBS 53Diagnostic Data Acquisition and Facility Computing • Design Objectives • All Data Available Online for Life of Machine • Access to All Engineering Process Control Data • Redundancy • All Data on RAID 5 • Battery Backup Cache • Dual Power Supply • Auto Configured Hot Spare RAID 5 Disk • Archive 3 Copies of Raw & Process Data • Nightly Backup of Local Data Acquisition Computer & Central Data Server • Data continuously Maintained on Central RAID 5 Storage Array G. Oliaro 9

  10. WBS 53Diagnostic Data Acquisition and Facility Computing • MDSplus (MIT) Set of Tools • Setup, Data Acquisition, Post-Processing Analyses, and Display • Pulsed Mode Experiments • MDSplus is becoming “standard” in fusion research throughout the world • Rich interface to platforms and languages • MDSplus Ported to VMS, Windows, UNIX • API’s for FORTRAN, C, Java, IDL, Visual Basic, and LabView. • PPPL will have a strong base of UNIX based MDSplus experience for NCSX design and startup requirements G. Oliaro 10

  11. WBS 53Diagnostic Data Acquisition and Facility Computing • Deploy 2 remote Data Acquisition I/O Processors (VME, CPI, CPCI) • 32 channels of magnetics sensors -16 bit,100KHz • E-Beam Measurements, 32 channels – 16 bit, 10 KHz • 32-64 channels of digital input & output points • One frame grabber • Deploy Primary UNIX Based MDSplus Data Acquisition Server with small data store of under 1TB • After the first year of operations: • Augment PPPL Facility Tape Backup System to 0.5 -1.0 PB • Augment PPPL Facility Compute Cluster G. Oliaro 11

  12. WBS 54Facility Timing and Synchronization • A new PCI based Timing And Synchronization System designed for NSTX will be deployed for NCSX. • Xilinx XC2S200, Spartan II, 200,000 logic & RAM gate FPGA • CeSys PCI XC2S board ~$400 • Each board has 6 multi-function channels • Timing • Timed Gate • Time Interval Counter • Clock Generator • Timing & Sequencing • A Signal Conditioning and Interface board has been designed to allow full output capabilities, (TTL, transformer & opto isolated) G. Oliaro 12

  13. WBS 54Facility Timing and Synchronization • Single Clock Generator with Multiple Receiver System G. Oliaro 13

  14. WBS 55Real Time Plasma and Power Supply Control System • Use Existing Hardware and Software System In Use For NSTX • Two Merlin 4 333MHz PPC Boards (20+ GFLOPS Total) • Clone Software With Parameter Changes for NCSX • Power Supply RTC (PSRTC) Software • GA Plasma Control System (PCS) Software • Add 64 Digitizer Channels in NCSX Test Cell in Two Crates • Systran FiberExtreme Fiber Channel (1 Gbps) to Power Supply Building • DMA (160MBps) Into Array Processor Using PPPL Developed FPDP Input Multiplexing Module (FIMM) G. Oliaro 14

  15. WBS 56Central Safety and Interlock System • Multi Site • Access Control at 2 Doors • Door Interlocks • E-Stop • Inputs from all Day 0 subsystems • Fail Safe Design • PLC monitoring and display • Outboard Mechanical Watch Dog Timers • Hard Wire Backup – Planned At This Time • UPS (?) • EPICS Monitoring G. Oliaro 15

  16. WBS 57Control Room Facility • 3200 sq.ft. Main Control Room & 600 sq.ft. Diagnostic Rack Space (Only a small portion of this will be used for Day ) operations) • Installation of 4 dual workstation tables wired for network and power. • Installation of 12-15 equipment racks wired for network and power. • Test Cell PA system • Wireless Ethernet for the Physics network to support visitors and laptop computers G. Oliaro 16

  17. Conclusions • The NCSX Design Leverages the NSTX Technology and Experience Base and Provides a Low Risk - Cost Effective Implementation. • Schedule Mirrors Actual NSTX Experience • Backend Loading Saves Cost and Optimizes Technology Choices • PPPL IT Infrastructure Upgrades Today Will Benefit NCSX • Technology Empowers Small (<10) Experienced NSTX Team G. Oliaro 17

  18. WBS 5 Cost & Schedule Central I&C (WBS 5) cost summary by expense class (WBS Level 3) Central I&C (WBS 5) cost summary by year of expenditure (WBS Level 2) G. Oliaro 18