180 likes | 358 Views
AIMS for Excellence Event 2011. Team Profile. Facilitator:. Project Leader :. Flavius Fariodi. Miftahudin. Team Member :. Area Head M. Nazaruddin. Mech. Engineer Kayat. Mech. Engineer Indra Z. Supervisor Sujoko S. Mech. Technician Firmansyah M. Instrument Tech. Nurul Azmi.
E N D
Team Profile Facilitator: Project Leader : Flavius Fariodi Miftahudin Team Member : Area Head M. Nazaruddin Mech. Engineer Kayat Mech. Engineer Indra Z. Supervisor Sujoko S. Mech. Technician Firmansyah M. Instrument Tech. NurulAzmi Maint. Planner Alvi H.
PLAN What are the improvements opportunity in your area ?What is the priority for improvement ? Show the data ! Step 1 Project Description (Background) : Based on record, expending budget for maintenance side had already too high or inefficient, from year to year our budget requirement for equipment become larger and larger. Therefore the main purpose of this project is to reduce maintenance cost itself. What can we reduce ? Basically WY equipment consist of three main equipment, which are log handling, chip handling and bark handling. The advantages by choosing bark handling project as follow : Bigger opportunity for improvement with more accurates data, knowledge and proportional scope of area as GT. On the other side, choose others will impact into invalid data because every cost on others handling will charge not only to one woodyard line but on all woodyard lines.
PLAN What is the business impact of the project? What is your project plan ? Step 1 Business Impact: Direct Saving Cost : USD 67,894.48 / yr Increase Production : Production Rate x Saving Time : 1280 ton / hr x 53.25 mins : 60 = 1136 ton (by reduce downtime)
PLAN What are major drivers of improvement opportunity ?Show what they are! Please justify with graph or data! Step 3 Analysis on Suspected Dominant Causes 1. OEM Bark Crusher spareparts price too costly
PLAN What are major drivers of improvement opportunity ?Show what they are! Justify with graph or data Step 3 2. Inefficient Function of Equipment
PLAN What are major drivers of improvement opportunity ?Show what they are! Justify with graph or data Step 3 3. When bark roller is worn out, replacement price too high Reff. PR 1000182924
PLAN What are major drivers of improvement opportunity ?Show what they are! Justify with graph or data Step 3 5. Missing Cover chain / V-Belt; Curtain Not Complete Missing Cover Dust / Sliver / Chip on Platform Curtain not Complete Cleaning frequency too seldom, not based on schedule Lifetime curtain approx. 1 month Forgot to reinstall cover after V-Belt replacement
PLAN What are major drivers of improvement opportunity ?Show what they are! Justify with graph or data Step 3 6. Speed too fast; V-Belt worn out abnormally • Cause of this situation : • Actual diameter of pulley motor didn’t meet standard requirement, therefore output speed increase from 129.77 m/min to 147.46 m/min • Effect of this situation: • Plug-up risk increase (overload at chute and rechipper) • V-belt, Bearing & Chain will be worn out faster • Bark separation can‘t be done properly (bumping cond.)
DO How is your implementation of measurable actionsthat address the root causes ? Step 5 1. Alternative source of vendor with acceptable quality Some of our OEM comes from METSO with delivery time around 2 months, and of course it follows with high price. The idea here is to find alternative source with shorter delivery time & acceptable quality. The result, there are several equipment that have alternative source. Estimated Saving Cost : $ 60,176.56 / yr
DO How is your implementation of measurable actionsthat address the root causes ? Step 5 3. Fabricate non-drive roller to central W/S instead of buy OEM Notif. 10190308 MO. 4310157 Roller OEM MC. 163473 (USD 6,988.24) Raw material MC. 19893 (USD 1,571.38) Saving Cost : USD 6988.24 – (1571.38 / 2) USD 6,202.55 / replacement (lifetime : 4 yrs) 6,202.55 / 4 yrs = USD 1550.64 / yr Engineering Drawing 3-323-M-1090 Raw Material length : 6000 mm Roller length : 2126 mm * Approximately one raw material can be used for two rollers
DO How is your implementation of measurable actionsthat address the root causes ? Step 5 4. Revised PM Check Form Before After • Improvement : • Frequency PM Check improve from weekly into daily • Specific item to be checked from each equipment from 25 common items, into 18 special item
DO How is your implementation of measurable actionsthat address the root causes ? Step 5 5.1. Propose New Cleaning Schedule Before After Before Before After After
DO How is your implementation of measurable actionsthat address the root causes ? Step 5 5.1. Propose New Cleaning Schedule (cont.) • BEFORE • Woodyard #3-4 have allocated manpower 10 peoples for cleaning purposes. However there is no standardization for cleaning. Sometimes area is clean and another day is not. • AFTER • Propose 2 peoples for bark handling equipments • Cleaning schedule every day • Fill checklist form for standardization Propose New Form
DO How is your implementation of measurable actionsthat address the root causes ? Step 5 5.2. Reinstall all missing cover & curtain Reinstall all missing cover & curtain when shutdown opportunity.
DO How is your implementation of measurable actionsthat address the root causes ? Step 5 5.2. Reinstall all missing cover & curtain (cont.) Reinstall all missing cover & curtain when shutdown opportunity. Before After
DO How is your implementation of measurable actionsthat address the root causes ? Step 5 5.3. Install warning sign on public board and socialization on safety meeting