An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pointing scenario - presented at the SWT #10 Detlef Koschny and the Science Operations TeamResearch and Scientific Support DepartmentESA/ESTEC detlef.koschny@rssd.esa.int Daily scheduleOverall status/How to proceedStatus of inputs

  2. Daily schedule • Day 1 (Th, 24 Mar 2003): CONSERT checkout and interference analysis • Day 2 (Fr, 25 Mar 2003): First pointing/slewing, switch on experiments, check experiments • Day 3 (Mo, 28 Mar 2003): Point at star fields and bright stars, co-alignment and distortion • Day 4 (Tu, 29 Mar 2003): Point at star fields and bright stars, co-alignment and distortion • Day 5 (We, 30 Mar 2003): Straylight test, 180 deg sun angle to 90 deg sun angle • Day 6 (Th, 31 Mar 2003): Straylight test, 90 deg sun angle to 45 deg sun angle • Day 7 (Fr, 01 Apr 2003): RSI operations • Day 8 (Mo, 04 Apr 2003): Straylight test, 45 deg sun angle to 20 deg sun angle • Day 9 (Tu, 05 Apr 2003): Planets, Stars and molecular clouds • Day 10 (We, 06 Apr 2003): Planets, Stars, and molecular clouds • Day 11 (Th, 07 Apr 2003): Contingency • Day 12 (Fr, 08 Apr 2003): Contingency

  3. General status • Technical note describing the scenario in Issue Draft h. Contains • Geometry info in graphical form (tables available on http://astro.estec.esa.nl/livelink, Rosetta/Mission Scenario Design/Scenario library/Pointing). • Our understanding of your requests, based on SOWG input, emails, etc. • Needs an estimated one more week to wrap up, convert to Master Science Plan • From your side: Prepare TC sequences – we need to fill in the names of the TC sequences (In some cases, ESOC is preparing this)! • How to proceed: • Face to face discussions (this afternoon?) • Monday I will send out the updated ITL with the Pointing Skeleton • Email – phone discussion to finalize it • Tuesday: Telecon RSOC-RMOC – discussion about pointing with Flight Dynamics • Finalize by 10 July, we finish Master Science Plan and send to ESOC

  4. Status of inputs • ALICE: No formal input, only A’Hearn’s input from SOWG 1 year ago • COSIMA: No requests • CONSERT: Input on procedure level, incorporated in our skeleton – needs final comments from CONSERT • GIADA: Inputs available, TC sequence names tbd • MIDAS: Inputs from SOWG, iteration needed – provide TC sequences • MIRO: Top-level input available from SOWG, Sam to check TN and Skeleton and send updated (“English prosa”) requests • OSIRIS: Top-level input incorporated in our skeleton – Nick to fill in TC sequence names • RPC: Inputs from SOWG, iteration needed • RSI: Requirements understood, pointing requests to be formulated by SOT • ROSINA: No requests • VIRTIS: Inputs available, incorporated in our skeleton – needs brush-up from SOT and filling in of detailed TC sequences