1 / 4

PM PRC Logistics Metrics Analysis Reporting System Background

PM PRC Logistics Metrics Analysis Reporting System Background. August 2, 2011. LMARS Authority. DOD 4140.1-R, DOD Supply Chain Material Management Regulation, May 23, 2003.

hide
Download Presentation

PM PRC Logistics Metrics Analysis Reporting System Background

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PM PRC Logistics Metrics Analysis Reporting System Background August 2, 2011

  2. LMARS Authority • DOD 4140.1-R, DOD Supply Chain Material Management Regulation, May 23, 2003. • Paragraph C8.8.2.4. To gauge logistic system timeliness, the performance data collection system developed and coordinated by the System Administrator for the Logistics Metric Analysis Reporting System (LMARS) and the Customer Wait Time/Time Definite Delivery data provided according to DoD Instruction 4140.61 … shall be used to produce applicable effectiveness reports. • AP13.1.5.1. The DLMS functional area PRCs replace and assume the responsibilities of most DLSS Focal Point Committees. The PRCs replace the Focal Point Committees as follows: • AP13.1.5.1.5. CWT PRC: LMARS.

  3. LMARS Authority(cont.) • DASD(SCI) Memorandum, subject: Establishment of the Pipeline Measurement (PM) Process Review Committee (PRC), dated September 24, 2010. • In accordance with the DoD Supply Chain Materiel Regulation (DOD 4140.1-R), the Customer Wait Time (CWT) PRC was responsible for maintaining the Logistics Metric Analysis Reporting System (LMARS) database to measure performance across currently measurable segments of the DoD supply chain… • Updating the credibility and usability of LMARS is necessary to reflect the impact of current and future business process changes on pipeline measurements. • To that end the DLA Logistics Management Standards Office (DLMSO) will lead a Pipeline Measurement Process Review Committee (PM PRC) in place of the former CWT PRC… • The major output of this PRC is to establish a formalized configuration management process for LMARS, thereby ensuring that changes to LMARS align with Supply Chain Metrics Group efforts.

  4. LMARS Authority(cont.) • DOD 4140.01-M (Draft), DOD Supply Chain Materiel Management Procedures • Volume 7, Paragraph 3.b. In developing analytical capabilities, the DoD Components should: • (1) Make use of existing information sources, including…existing data repositories (e.g., Logistics Metrics Analysis Reporting System (LMARS)) • Volume 8, Paragraph 2.c.(2)(a). Review issues relating to CWT reporting and Logistics Metric Analysis Reporting System (LMARS) as requested by … DASD(SCI) …The DoD Components or DLA Transaction Services may submit issues for consideration directly to the DASD(SCI) or through their PM PRC representative. • Volume 8, Paragraph 3.a.(2)(d). To gauge logistic system timeliness, the performance data collection system developed and coordinated by the DLA Transaction Services System Administrator for the LMARS and the CWT data provided according to DoDI 4140.61 shall be used to produce applicable effectiveness reports.

More Related