NeuLAND session at R3B technical meeting April 2010. Overview - Konstanze Boretzky 20 min What is new? Consequences and timelines RPC preliminary results from GSI – from Christoph Caesar NeuLAND in India – from Ushasi Datta Pramanik

hisoki
Download Presentation

NeuLAND session at R3B technical meeting April 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NeuLAND session at R3B technical meeting April 2010 • Overview - Konstanze Boretzky 20 min • What is new? • Consequences and timelines • RPC preliminary results from GSI – from Christoph Caesar • NeuLAND in India – from Ushasi Datta Pramanik • Scintillator concept – Michael Heil 15(+5) min • RPC data from e- beam – Daniel Bemmerer 15(+5) min • RPC simulations – Zoltan Elekes 15(+5) min • Electric properties of long counters – Diego Gonzalez Diaz 10 min

  2. What is new? • Personnel situation for simulations improved substantially: • GSI: Michael Heil, Diego Gonzalez Diaz (Denis Bertini for R3B root) • FZD: Zoltan Elekes • Univ. Cologne: Vassili Maroussov • Univ. Lisbon – Daniel Galaviz + student • ( Chalmers – Håkan Johansson + students) • Alternative detector concept • Prototype test using neutrons • timelines

  3. NeuLAND plastic? A thickness of 2 m of pure plastic scintillators is sufficient: • Possible dimensions: • 2 x 2 x 2 m • bars of 5 x 5 cm 2 m long • 1600 bars • 3200 PM's

  4. Status as of today • RPC concept: • FZD: small and full size prototypes, tests and simulations • GSI: analysis of neutron data (Uppsala), implementation of TACQUILA, study of electric properties of long counters, gas recycling system • SINP: prototypes, test in June in FZD • Univ. Lisbon: simulations • Scintillator concept: • GSI: simulation, prototypes, readout • Univ. Cologne: simulation • SINP: contribution envisaged

  5. Challenge for 2010 and 2011 • 2010 – Serious investigations for both solutions • Simulation (two independent simulation approaches per detector) • Development of full size detectors – RPC and Scintillator • 2011 – Characterization of RPC and Scintillator protoypes with fast neutrons  Exp. S406, presented tomorrow afternoon Technical Design Report

  6. Timelines R3B and NeuLAND 2010: construction of full-size prototypes RPC and Scintillator 2011: latest Q3: exposure to fast neutrons at Cave C -  TDR 2012: fabrication of 10-20% of NeuLAND counter 2013: installation, commission and first physics experiment at R3B at Cave C using demonstrator ongoing production 2014: ongoing production 2016: moving to R3B Cave, finishing production 2017: first R3B experiment in full setup at new Cave

  7. RPC tests with neutrons at TSL Uppsala combined effort from GSI and FZD team Spokesperson: Daniel Bemmerer

  8. Experimental setup The TSL Neutron Beam Facility • Energy of primary proton beam: • 179MeV • Lithium target thickness: • 23.5 mm • Average energy of peak neutrons: • 174.7 MeV • created by: 7Li(p,n)7Be • neutron flux ±10% • ~ 5000 /(s * cm^2) • beam diameter ~ 10 cm RPC Stand Scintillator Medley Setup Medley Setup Medley Setup Medley Setup Medley Setup Medley Setup Medley Setup Medley Setup Medley Setup Dangtip et al., Nucl. Inst. Meth. A 452, 484 (2000) Dangtip et al., Nucl. Inst. Meth. A 452, 484 (2000) Dangtip et al., Nucl. Inst. Meth. A 452, 484 (2000) Dangtip et al., Nucl. Inst. Meth. A 452, 484 (2000) Dangtip et al., Nucl. Inst. Meth. A 452, 484 (2000) Dangtip et al., Nucl. Inst. Meth. A 452, 484 (2000) Dangtip et al., Nucl. Inst. Meth. A 452, 484 (2000) Dangtip et al., Nucl. Inst. Meth. A 452, 484 (2000)

  9. tested prototypes • GSI-1 • rectangular strip ends • GSI-2 • triangular strip ends • GSI-3 • triangular strip ends and • coupled with transformers • FZD-1 • gaps: 2*3, readout: FOPI&PADI, • misc: common ground • FZD-2 • gaps: 2*3, strip width: 12 mm, • readout: ALICE • FZD-3 • gaps: 2*3, readout: FOPI, misc: transf. 3.3pF, • seperate ground • FZD-4 • gaps: 2*3, interstrip-distance: 1.6mm, • readout: FOPI, misc: cathode ground • FZD-5 • gaps: 4*1, readout: FOPI&PADI, • misc: common ground

  10. Neutron Energy - detected number of neutrons * expected number of neutrons Prokofiev et al., Radiat. Prot. Dosimetry 126, 18 (2007)

  11. Efficiency threshold VALID_TIME ENERGY_CUT POSITION_CUT efficiency ~ (0.74±0.38) % Error (sources): • determine beam spot size on detector (~30%) • difference in efficiency between left & right readout (~10%) • difference in efficiency between strips (~40%) • uncertainty in neutron Flux given by n-monitors (~10%)