An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HITECH BIMSERVICES BIMModelfor Construction Company www.hitechbimservices.com

  2. ProjectTypeandLocation ClientProfile Presentation Outline ClientRequirements ProjectChallenges OurInputs & Solution ProjectOutputs

  3. ProjectTypeandLocation CreationofBIMModelswithLOD-300fora parkinCalifornia

  4. ClientProfile: Abuildingconstructioncompanyfromthe USA. ItisintotheConstruction & Engineering Businesssince80years.

  5. ClientRequirements: Clientprovidedinitialarchitecturaldrawingsto Hitechasbasistocreatestructuraldrawings andtherebycreateaRevitBIMmodelforLOD 300standards.

  6. ProjectChallenges: Thestructuraldrawingswasmissinginthefile. Wemadeastructuremodelonthebasisof assumptionfromthearchitecturaldrawings providedbytheclient.Latertheclient provideduswithahandsketchwhichwas90% accuratetowhatwehadassumed.

  7. OurInputs & Solution: WehadpdffilesasainputsandweconverteditintointelligentBIMmodels usingRevit. Nextstepwecreated3DRevitModelswithdifferentdisciplineslike Architectural,Structural & MEP. Afterthatwestartedtolookintothecoordinationbetweenthemodels,socalled ClashDetection & weresuccessfulinscrutinizingalltheclashes. Weprovidedmaterialtakeoff & projectcompletionschedulestoclientto reduceoverallprojecttime,costfortheerrorfreeandsmootherconstruction process.

  8. ProjectOutputs Belowaretheprojectimageswithdifferentview forthehospitalitybuilding.

  9. BuildingView

  10. PerspectiveView

  11. SectionalViews

  12. SectionalViews

  13. StudioPlanViews

  14. InteriorViews

  15. ContactUs Address Hi-TechHouse,NearGurukulTower,Gurukul, Ahmedabad,Gujarat380052,India PhoneNumber +91-794-000-3252 EmailAddress info@hitechbimservices.com