20 likes | 223 Views
FAR Case. Revises subpart 19.7 and clauses at 52.219-9 & 52.219-25 to replace all references to SF-294, SF-295, and Optional Form 312 with eSRS.
E N D
FAR Case • Revises subpart 19.7 and clauses at 52.219-9 & 52.219-25 to replace all references to SF-294, SF-295, and Optional Form 312 with eSRS. • Revises the flow-down provision at 19.704(a)(9) and 52.219-9(d)(9) to require the prime contractor to flow the prime contract number down to the subcontractors at lower tiers • prime contract number now becomes a mandatory field in the eSRS, even for subcontractors, in order to facilitate lower-tier reporting.
FAR Case (continued) • Moves “General Instructions” from the paper forms to the clause at 52.219-9. • Requires contractors to print a hard copy of the Summary Report(s) and have them signed by the CEO. • Contractor will be required to keep hard copy with CEO’s signature on file for 4 years. • SF-294, SF-295, & Optional Form 312 will all be deleted from Part 53 – i.e., abolished!