An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Liquid-hydrogen absorber: status report Shigeru Ishimoto KEK UKNF/MICE Oversight Committee meeting, RAL, Jul-21, 22, 2008 • Contents • Introduction • MICE absorber design • Prototype absorber test at KEK • MICE absorber instrumentation • Schedule • Summary hydrangea

  2. AFC Module 2 RFCC Module 1 Tracker Module 2 AFC Module 3 AFC Module 1 RFCC Module 1 Tracker Module 1 MICE cooling channel m BEAM Drawing by S. Q. Yang

  3. AFC (Absorber & Focus Coil) module Cryomech PT415 cooler (1.5W@4.2K) LH2 condenser absorber windows Safety windows

  4. G-H2 OUT Mini In-Flange (Al-SS) G-He/N2 OUT G-10 Support Absorber & Pipes  L-H2 IN L-He/N2 IN Tee 30 Pin Feedthrough

  5. A-A’ (22.5 deg.) G-He/N2 OUT G-H2 OUT Heat- exchanger LH2 LH2 Tee  L-H2 IN LHe/LN2 IN 30 Pin Feedthrough

  6. Liquid-hydrogen absorber MIRAPRO Co.

  7. Flange of MICE absorber Tolerance between flange and body: 0.1-0.3 mm Design window; Oxford Design flange; KEK Machining ; Mississippi

  8. Small flange and G-10 support G-10 (x8) t=1, W=25, L=90 mm Total ~ 0.2 W 34 SS f15.7 6.5 7 SS, t=1 Screws on AFC Magnet 34 AL f14.8 From Absorber

  9. Tee and 30 pin feedthrough In seal Kyocera 30 pin feedthrogh

  10. Support for pipe welding DL < 0.5mm pipe welding

  11. MICE absorber test at KEK G-M Cryocooler 1.5W@4.2K LH2 condenser T.M.P. 1,959 Dummy bore (room temperature) Prototype absorber

  12. Prototype absorber

  13. Prototype absorber test at KEK

  14. Liquefaction and vaporization of LH2 in 20 l Absorber 2000 l tank 0.30 l / h , 2.6 W 1.33 l / h , 11.7 W  68 hrs to fill 20 l LH2 1.43 l Cooling stop

  15. MICE absorber test at KEK H2 vapor Cernox calibration curve

  16. MICE absorber test at KEK H2 Press(Torr) n-H2 Temp.(K) T (K) e-H2 Temp.(K) Absorber Temp.(K) DAY

  17. Temperature & level sensors in the absorber In LH2 10 Cernox 1050SD 4 wires; AB101, 102, 105, 109,110 2 wires; AB103,104,106,107,108 (Total 5*4 + 5*2 = 30 wires) Im=0.1 mA; 101,103,105,107,109 Im=1 mA; 102,104,106,108,110 over heating mode in gas

  18. Sensor and heater (overall) HTR-25W-100W 25.4

  19. Sensor blocks 20 5 2 cernox inside absorber 19 2 or 4 x 0.14 mm2 ETFE cable CX-1050-SD cernox for L-H2 pipes 16 20 cernox for L-N2 pipes

  20. MICE absorber schedule STEP V STEP IV Spring 2010 STEP VI Delivery of 1st FC Oct 2009 Q4 2010 -- 2011 KEK to RAL KEK RAL Arrive 2 absorber flanges from US

  21. Summary • Absorber R&D at KEK was successfully finished and MICE absorbers were designed based on this experience. • We are ordering the first MICE absorber body to Japanese company. It will be delivered by the end of Oct-2008 after the cooling test at KEK. The Second absorber will be ordered in Nov-2008, and delivered by Feb-2009. • Thermometer/level sensors inside and outside absorber body will be wired in Japan. • Thin absorber flanges will be set at RAL. First flanges will be delivered by May-2009 from Univ. of Mississippi. • The overall assemble in the AFC module will start from Jul-2009 at RAL.

  22. Thank you Hokusai Katsushika “Hydrangea and Swallow”