40 likes | 50 Views
LC. LC. 2013 Indiana Pre-Shift Contest. FACE NOT BOLTED WITHIN 24 HOURS. Last row of Permanent support. ENTRY #1 OFFSIGHTS. Last row of Permanent support. FACE. FACE. FACE. x. x. x. Danger out last row. D I. D I. GT. GT. Danger out last row. X X X X. X X X X.
E N D
LC LC 2013 Indiana Pre-Shift Contest FACE NOT BOLTED WITHIN 24 HOURS Last row of Permanent support ENTRY #1 OFFSIGHTS Last row of Permanent support FACE FACE FACE x x x Danger out last row DI DI GT GT Danger out last row X X X X X X X X Energized Continuous Mining Machine Last row of Permanent support LC DE-ENERGIZE X X X X DI GT Danger out last row DANGER DI Water Over Knee Deep Test hole DANGER DI X X NO TEST HOLE DANGER DI Test hole Water over Knee deep HANG CURTAIN High spot In roof DANGER DI Energized Non-permissible Pump X X GT DE-ENERGIZE AND MOVE 2.0% CH4 20.5% O2 NO TEST HOLE Test hole R O O F B A D GT DANGER DI GT2 DANGER DI X DANGER DI Energized Roof bolter HANG CURTAIN HANG CURTAIN Test hole DE-ENERGIZE D Test hole SCOOP ON RB CABLE Test hole Battery scoop X X NO TEST HOLE R/R R/R R/R COAL PILE 8’x10’x1’ BELT TAIL & FEEDER DANGER COAL PILE DANGER FLOAT DUST HANG CURTAIN AT TAIL FLOAT DUST ON RIBS Test hole Test hole X GT DI GT DI PRY BAR LC X NO LIFELINE R LC LC X X R X X POWER CENTER D GT DI X X CLOSE REGULATOR DOOR OPEN PROBE Test hole CLOSE DOOR THREE BELT ROLLERS SCALE 1” = 10’ NO LIFELINE
LC LC 2013 Indiana Pre-Shift Contest Last row of Permanent support Last row of Permanent support FACE FACE FACE x x x X X X X X X X X Energized Continuous Mining Machine Last row of Permanent support LC X X X X Water Over Knee Deep Test hole X X Test hole Water over Knee deep High spot In roof Energized Non-permissible Pump X X 2.0% CH4 20.5% O2 Test hole R O O F B A D X Energized Roof bolter Test hole Test hole Test hole Battery scoop X X COAL PILE 8’x10’x1’ BELT TAIL & FEEDER FLOAT DUST ON RIBS Test hole Test hole FIREBOSS STATION X PRY BAR LC X R LC LC X X R X X POWER CENTER X D X X DOOR OPEN PROBE Test hole THREE BELT ROLLERS TEAM NO. ______ FIELD NO. ______ SCALE 1” = 10’
2013 Indiana Pre-Shift Contest FIREBOSS STATION POWER CENTER X TEAM NO. ______ FIELD NO. ______ SCALE 1” = 10’
Typical Ventilation Map R POWER CENTER