GLAST Large Area Telescope LAT Flight Software System Checkout TRR Wrap-up Dick Horn FSW Manager

Gamma-ray Large Area Space Telescope. GLAST Large Area Telescope LAT Flight Software System Checkout TRR Wrap-up Dick Horn FSW Manager Stanford Linear Accelerator Center. FSW System Checkout FQT Lien Summary. Documents Final updates to test procedures as needed based on formal dry runs

hunter-goff
Download Presentation

GLAST Large Area Telescope LAT Flight Software System Checkout TRR Wrap-up Dick Horn FSW Manager

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gamma-ray Large Area Space Telescope GLAST Large Area Telescope LAT Flight Software System Checkout TRR Wrap-up Dick Horn FSW Manager Stanford Linear Accelerator Center

  2. FSW System Checkout FQT Lien Summary • Documents • Final updates to test procedures as needed based on formal dry runs • Telecommand and Telemetry Formats to be generated and approved by FSW CCB (LAT-level approval to follow, but not a lien) • Development: Create FSW build to address the following • Implementation of output to the Science Data Interface • Command/control/telemetry/mode interface to event data (LPA) • Open JIRA items (excluding those already identified as deferred) • VSC science data decoder • Scripts • Complete each script, incorporating cleared development liens as applicable • Dry run each script • Individual scripts can be run for FQT once liens against it are cleared FSW System Checkout TRR: Wrap-up

  3. Summary of Additional Actions • Note that the following planned actions are not liens to FQT start • Close open RFAs • Documents • Ensure completion of approval process for relevant docs • Complete docs for final FSW delivery • FSW Design Document • FSW Maintenance Plan FSW System Checkout TRR: Wrap-up

  4. Additional Liens & Actions • Review of additional issues identified at TRR FSW System Checkout TRR: Wrap-up

  5. TRR Summary • Readiness to begin FSW System Checkout FQT is in sight • All requirements have been mapped to tests • Open development, EGSE issues clearly identified • Clear path identified for completion of test scripts • FSW test program is thorough & complete FSW System Checkout TRR: Wrap-up