An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P6 Enhancement Requests 2011 Version 8.1 and beyond

  2. Categories • Import/Export • Printing • Activity Views • Comparison & Analysis • Updates & Progressing • Gantt Chart & Bars • Budgeting & Costs • Activity Details • Global Change • User Experience

  3. 1. Import/Export • More formats than XML for import • Ability to export views with a project • A “data stripping” feature to allow clean imports without meta data such as codes, upon import • Options to “mark” import meta data so those resources, codes, UDF, etc are tagged as part of the imported project (IE: xx-Bob Smith, xx-Change #456) • Ability to export multiple projects in one XML file • Check box options where, if calendar doesn’t match, make project calendar. Same with UDF and cost accounts

  4. 2. Printing • Ability to highlight an activity and print WSIWYG • Print preview on all views • Print 12 months to a page of a non-working calendar • Print to 11 X 17page and to plotters

  5. 3. Activity Views • Ability to send project views when copying a project. • A steps column to display progress of steps (eg, Step 5 of 9 complete). • Ability to highlight an activity or to use conditional formatting. • “Lag” as a column. • Ability to filter the logic in a Gantt chart (eg., filter and show only driving, etc.). • Add notebooks to trace logic view. • Create a floating pallette of resource allocations histograms so can be seen with activity table. • Ability to lock a view.

  6. 4. Comparison & Analysis • Ability to compare baseline activity calendars to project activity calendars • Ability to auto-level a reflection or copy of a project and to have a “leveled dates” field to compare to non-leveled dates • Ability to compare EV from period to period

  7. 5. Updates & Progressing • Utilize start and finish dates from the baseline rather than planned dates (problematic once baseline contains progress) • Update actuals figure by start and finish rather than by planned dates or provide an option • Suspend and resume often default to midnight and should be separated from the time setting • In Progress Reporter input provide option to allow a single input to parse over a week

  8. 6. Gantt Charts & Bars • Ability to group in the Gantt chart • When no baseline is set Gantt chart should show no bars • More color options for Summary bars, perhaps based on WBS

  9. 7. Budgeting & Costs • Provide different currencies at the project level instead of as an Application Level Setting • Top down budgeting returned as a feature • Provide more than 5 rate types for roles and resources • Enhanced use of P6 as an estimating tool

  10. 8. Activity Details • Ability to customize a details “portlet” on activities screen, eg., UDFs, assigned codes, etc. • Provide a tab for user defined fields just as General, Status, etc.

  11. 9. Global Change • Ability to batch global changes • Enhanced global change to overcome start and finish not being equal to actuals on a baseline

  12. 10. User Experience • Embed UPK “do it” into P6 • Allow CTRL+F search feature • Ability to create a schedule using a logic diagram which then creates the WBS from grouping and the activities from boxes • Feature to drag and drop WBS elements • More clarity in the installation documentation • Provide a combined F9 and F5 so screen refresh happens when project is scheduled

  13. THANK YOU! Daniel Williams, OPSIG President Elaine Krazer, PMP; OPSIG P6 Lead