An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LHCb Resource requests for (2011),2012,2013 M.Cattaneo (and R. Graciani) WLCG Overview Board 18 March 2010 Summary from LHCb-PUB-2011-009 (updated, to reduce tape usage)

  2. Overview • Changes to Computing Model • 2011 Re-assessment • 2012-2013 requests Overview Board, 18 March 2011

  3. Changes to Computing Model (I) • LHC has increased mean number of visible proton-proton collisions per bunch crossing relative to LHCb TDR design: • from 0.4 to 2.0 • This implies changes to basic parameters of the model: Overview Board, 18 March 2011

  4. Changes to the Computing Model (II) • Reduce number of replicas to accommodate larger events: • 4 T0D1 replicas (was 2 T1D1 (‘master’) plus 5 T0D1 (‘secondary’)) • All are now considered ‘secondary’ • Archival: • 2 archive: T1D0 (T2D0 at CERN for RAW) • ‘master’ copy written directly to archival storage • In previous model, T1D1 masters migrated to T1D0 at ‘archival’ time • More aggressive reduction of old data from disk: • keep 2 versions + ½ of next version Overview Board, 18 March 2011

  5. Changes to Computing Model (III) • Baseline: b Physics: • 2 kHz of Trigger • 10% retention in Stripping • RAW: 500 TB/year • SDTS: 400 TB/pass • DST: 130 TB/pass • New: c Physics • 1 kHz of Trigger • 100% retention in Stripping • 10% reduction in size after Stripping • RAW: 250 TB/year • MDST: 65 TB/pass • Monte Carlo dedicated to b/c samples • DST: 300 TB/year Overview Board, 18 March 2011

  6. 2011 Re-assessment CPU • Average work fits well within pledge • Peak power during full reprocessing exceeds the average pledge Overview Board, 18 March 2011

  7. 2011 Re-assessment Storage • Small amount of extra disk needed • Reduction in tape at Tier1, increase at CERN Overview Board, 18 March 2011

  8. 2012 and 2013 estimates • Changes in 2012 with respect to 2011: • One additional reprocessing of 2010+2011 data • 30% increase in user activity • Changes in 2013 with respect to 2012 • No LHC running • Re-stripping of full 2010-2012 sample in spring • Reprocessing of full 2010-2012 sample in autumn • Additional simulation, using Tier0/Tier1 resources dedicated to quasi-online data processing in previous years Overview Board, 18 March 2011

  9. 2011-2013 CPU Overview Board, 18 March 2011

  10. 2011-2013 Storage Overview Board, 18 March 2011