90 likes | 193 Views
APEX Summary June 5-6. Fulvia Pilat Time Meeting, June 12, 2007. Abreu, Fischer, + team. Ramps. Initial intensity = 3.5 x 10 9 Ramp Efficiency: 87% Y and 94% B. Initial intensity = 4 and 7 x 10 9 Ramp Efficiency: 84% Y and 86% B. Marusic, Fischer, Ptitsyn.
E N D
APEX SummaryJune 5-6 Fulvia Pilat Time Meeting, June 12, 2007
Abreu, Fischer, + team Ramps Initial intensity = 3.5 x 109 Ramp Efficiency: 87% Y and 94% B Initial intensity = 4 and 7 x 109 Ramp Efficiency: 84% Y and 86% B
Marusic, Fischer, Ptitsyn Results June 5orbit drift correction
Results June 5 – tunes and ramp Ramp transmission OK (Artus IPM on) Will try tomorrow tunes, orbits, chrom drift compensation + ramp IF OK In operations
Beam parameter comparison with the reference Coupling measurements: dQmin <0.002 Dispersion and beam loss measurements -> to be analyzed Optimal AGS field trim: 5.0Gs (Blue), 4.5Gs(Yellow) Ptitsyn + team
Ramps with ~1.3e9/bunch, 103 bunches Different chromaticity settings Ptitsyn, Wei + team Blue chrom: -2 Yellow chrom: +2 Blue chrom: +2 Yellow chrom: -2
The instability caught by Button BPM Sum signal Difference signal Yellow vertical Instability happened ~50ms after transition and continued for ~40ms