1 / 28

Stjernholm Dagen d. 31. august – 02. september 2010

Stjernholm Dagen d. 31. august – 02. september 2010. ”Optimering af sandfang på renseanlæg” v/ Kaj Stjernholm, Stjernholm A/S. Stjernholm Dagen d. 31. august – 02. september 2010. Hvad er et sandfang? Beluftet sand- og fedtfang Sandpumper-mammutpumper/centrifugalpumper

hyman
Download Presentation

Stjernholm Dagen d. 31. august – 02. september 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Stjernholm Dagen d. 31. august – 02. september 2010 ”Optimering af sandfang på renseanlæg” v/ Kaj Stjernholm, Stjernholm A/S

  2. Stjernholm Dagen d. 31. august – 02. september 2010 Hvad er et sandfang? • Beluftet sand- og fedtfang • Sandpumper-mammutpumper/centrifugalpumper • Luftindblæsning for ”vægtfylden” og fedt • Opholdstider • Tørvejr > 8 min • Regnvejr-5 min • Dimensioneret for 4-8 kg PE årlig – (Vejrsituationen) Formål: • Fjerne større uorganisk partikler, dvs. sand og grus • Fjerne fedt i kombinerede sand- og fedtfang • Holde det organiske materiale opblandet

  3. Stjernholm Dagen d. 31. august – 02. september 2010 Eksempel Beluftet sandfang

  4. Stjernholm Dagen d. 31. august – 02. september 2010 Hvad er der gjort? Fokus siden 2000 på sandfang • Forsøgt optimering med indløbsflow og luft • Lavet hastighedsmåliger med ultralydsmåler • Monteret sandvaskere på mange anlæg • Bevidsthed om sand og kornstørrelser ?? Og hvorfor • Slidtage eks. på centrifuger/dekantere • Aflejringer af sand i procestanke og rådnetanke • Det kan koste mange penge

  5. Stjernholm Dagen d. 31. august – 02. september 2010 Målepunkter: Sandfang set fra siden: Sandfang set fra oven: Q. ind Q. ud Q. ud Q. ind

  6. Hastighedsprofiler fra Broager Renseanlæg:Stjernholm Dagen d. 31. august – 02. september 2010 Profil fra Z= 150 cm – Ingen beluftning: Profil fra Z= 150 cm – Fuld beluftning:

  7. Stjernholm Dagen d. 31. august – 02. september 2010 Randers – Pumpestation P27

  8. Stjernholm Dagen d. 31. august – 02. september 2010

  9. Stjernholm Dagen d. 31. august – 02. september 2010 Fokus på: • Synkehastighed i forhold til størrelse • Sandkornsstørrelse • Afsyret gløderest

  10. Stjernholm Dagen d. 31. august – 02. september 2010 Bundfældningshastigheder under optimale forhold

  11. Stjernholm Dagen d. 31. august – 02. september 2010

  12. Stjernholm Dagen d. 31. august – 02. september 2010 ” Sandprøver fra procestanken på et Renseanlæg” Afsyret gløderest

  13. Stjernholm Dagen d. 31. august – 02. september 2010 ”Sigtekornskurver” Kumulativ

  14. Stjernholm Dagen d. 31. august – 02. september 2010 Aflejringer i tanke: • Sandfang • Procestanke • Rådnetanke

  15. Stjernholm Dagen d. 31. august – 02. september 2010 Problemstilling med mammutpumper i sandfang

  16. Stjernholm Dagen d. 31. august – 02. september 2010 Under første tømning!

  17. Stjernholm Dagen d. 31. august – 02. september 2010 Årsag til tjek af sandfang! •50 m3 Sand i hver procestank på et år

  18. Stjernholm Dagen d. 31. august – 02. september 2010 Vi har monteret sandvaskere: • Er det godt? • Giver det negative påvirkninger? • Styring i tørvejr/regn? • Ekstern sand?

  19. Stjernholm Dagen d. 31. august – 02. september 2010

  20. Stjernholm Dagen d. 31. august – 02. september 2010

  21. Stjernholm Dagen d. 31. august – 02. september 2010 Fremtidens optimale sandseparation • Sandcykloner <0,1 mm. • Hvirvelseparator 0,1-0,15 mm. • Beluftet sandfang 0,2 mm. • Cirkulære sandfang 0,2 mm vortex princippet

  22. Stjernholm Dagen d. 31. august – 02. september 2010 Cyklonprincippet

  23. Stjernholm Dagen d. 31. august – 02. september 2010 Beluftet sand og fedtfang

  24. Stjernholm Dagen d. 31. august – 02. september 2010

  25. Stjernholm Dagen d. 31. august – 02. september 2010 Hvor stort et problem er sand på rense- anlæg, og hvad kan der gøres for at mindske problemets omfang • Analysere på returslammet i primærtanken • Analysere på returslammet i bio. tankene • Sigteanalyse på sand udtaget i sandfang • Sigteanalyse på sand udtaget i rådnetanke • Optimering af sandfang – reducere beluftningen • Optimering af sandfang – flowstyret beluftning • Hastighedsmåling i sandfang • Ændring af sandfangets driftstider • Bygge nye sandfang?

  26. Stjernholm Dagen d. 31. august – 02. september 2010 Kræver: • Bevidsthed om sandfanget • Løbende kontrol • Rigtig/optimal dimensionering af sandfang set i forhold til flow og den hydrauliske belastning

  27. Stjernholm Dagen d. 31. august – 02. september 2010 Mål - undgå: • Kortslutningsstrømme • Sand videre i anlægget • Ekstra omkostninger til slidtage • Mindre volumen i tankene • Hvis driftspersonale tænker på sandfanget som på efterklaringstanken • undgå slamflugt = undgå ”sandflugt”

  28. Stjernholm Dagen d. 31. august – 02. september 2010 Spørgsmål? Tak for opmærksomheden

More Related