1 / 16

Use of Resources

Use of Resources. Cost details in Form Cs. Agenda. Introduction What is the new feature in a Form C What will be achieved What will it look like Business Logic New-style Form Cs Old-style Form Cs Reporting Per Activity Type Per Cost Type Per Work Package Questions. Introduction.

hyman
Download Presentation

Use of Resources

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Use of Resources Cost details in Form Cs

  2. Agenda • Introduction • What is the new feature in a Form C • What will be achieved • What will it look like • Business Logic • New-style Form Cs • Old-style Form Cs • Reporting • Per Activity Type • Per Cost Type • Per Work Package • Questions

  3. Introduction In current Form Cs the user writes the amount of costs directly in the editable cells of the cost matrix.

  4. In new-style Form Cs the user will be able to click on a cell and add inside a pop-up window, one or more lines of details for: Cost Explanation Work Package

  5. In this way, the user can: • Split the total costs in sub-costs defining different descriptions and work packages for each cost item. • Have reports grouped by these details (for example costs per work package).

  6. New-style Form Cs Upon clicking on a cell of an empty cost matrix, the follwoing pop-up will be shown

  7. The title of the window presents the Activity Type and the Cost Type of the selected cell.

  8. Edit cost details • “Cost” field is mandatory • Total cost is automatically calculated

  9. Add new lines • Upon clicking on the “plus” icon a new empty row is added

  10. Delete lines • Upon clicking on the “X” icon If only one row exists/remains then the “X” icon becomes disabled.

  11. Copy the TOTAL cost back to the cell Upon clicking the “Done” button the sum of the detail lines is copied back to the corresponding field of Form C

  12. Old-style Form Cs • No changes. But, if users want to convert an old-style Form C to a new-style (with details) they can double- click on a cell. A confirmation pop up window will be shown

  13. Actual Indirect Costs No details will be provided. The field will remain as it is, directly editable.

  14. PDF Reporting per Form C • The Coordinator can view a printable summary of: • Details per Activity • Details per Cost Type • Details per Work Package • Can be accessed through: • A link in the Form C screen • A separate tab in FORCE • A link next to “Submission History”

  15. Example: Cost details per Activity

  16. Questions?

More Related