MP3 status week 31. N. Catalan Lasheras. Monday 3th August. Beam dump triggered by QPS without any clear reason The trip was caused by a circuit breaker spontaneous opening in the crate controlling 18L3 detector. Intervention required. Sunday 1 st August.

ila-calhoun
Download Presentation

MP3 status week 31

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MP3 status week 31 N. Catalan Lasheras MP3: August 4th 2010

  2. Monday 3th August • Beam dump triggered by QPS without any clear reason • The trip was caused by a circuit breaker spontaneous opening in the crate controlling 18L3 detector. Intervention required NCL – MP3 4th August 2010

  3. Sunday 1st August • Beam dump caused by RB.A56 trip due to a water fault in the converter • Fuse in the converted broken • Changed by EPC • QPS EE switch A1 opened. Probably a false flag. • Fault cleared after reopening the switches NCL – MP3 4th August 2010

  4. Saturday 31 July • Beam dump due to RQTD, RQTF trips after re-enabling the tune feedback at flat-top • Happened several times. Not really a circuit fault NCL – MP3 4th August 2010

  5. Tuesday 27 July • RCBXH1.R2 U_res signal with a significant offset tripped during pre-cycle • Required an access at 02:00 to be reset from the tunnel NCL – MP3 4th August 2010

  6. Tuesday 26th July • Two beam dumps triggered by IPQs involving heater discharges • RQ9.R2 at 08:59:28 • RQ6.R1 at 13:39:36 • Both discharged were ok but the reasons for the discharge are still unknown. NCL – MP3 4th August 2010

  7. Monday 26th July • Access granted with current in the main circuits NCL – MP3 4th August 2010

  8. IPQs bus-bar resistance measurements • Measurement of bus-bar resistance for the 6kA circuits • Reference values for time evolution and nQPS upgrade • Already 14 magnets measured in the dispersion suppressor • All values around 5 nOhms. • Measurements require special equipment displaced and connected during the technical stops. • Reduced hardware commissioning required NCL – MP3 4thAugust 2010

  9. Q10-Q9 sensitivity (to storms) • Special configuration applied to these magnets to measure higher range voltage • Poor resolution on the low voltage range • High sensitivity to noise of the triggering signal • Restoring he nominal settings will imply removing two resistors for each card. • MP3 recommended to test in the lab and implement 1-2 examples during the next technical stop. NCL – MP3 4th August 2010

  10. New support mode from MP3 • Two persons on call for LHC operation • 7:00 to 19:00 on weekdays • 19:00 to 7:00 on weekdays and 24/24 on weekends • Assistance to the 8:30 and 9:00 meetings • Close follow-up of the LHC operation (similar to the machine supervisors) • Shifts (afternoon and night) will be organized after technical stops x162266 NCL – MP3 4th August 2010

  11. New support mode from MP3 • Hardware procedures and test plan for next shutdown under revision • New tools on preparation • New interlocks that may lock the circuits after automatic analysis of the data • Same commitment of the MP3 members but resource optimization • Already in this mode for the last week NCL – MP3 4th August 2010