1 / 10

Operational Global Model Plans

Operational Global Model Plans. John Derber. Timeline. July 25, 2013: Completion of phase 1 WCOSS transition August 20, 2013: GDAS/GFS model/analysis upgrade #1 April 2014: GDAS/GFS model/analysis upgrade #2 Jan - June 2015: phase 2 WCOSS transition

ilana
Download Presentation

Operational Global Model Plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Operational Global Model Plans John Derber

  2. Timeline • July 25, 2013: Completion of phase 1 WCOSS transition • August 20, 2013: GDAS/GFS model/analysis upgrade #1 • April 2014: GDAS/GFS model/analysis upgrade #2 • Jan - June 2015: phase 2 WCOSS transition • Dec. 2015: GDAS/GFS/GEFS model/analysis upgrade #3 • Beyond 2016

  3. Global Upgrade #1 (Aug. 20, 2013) • Primarily observation usage upgrade • Include METOP-B, NPP-CrIS, MSG-3 in data assimilation system • Possibly include post processor changes

  4. Global upgrade #2 (April 2014)Probable components • Model • T1534 Semi-Lagrangian (~13km globally) • Use of high resolution daily SST and sea ice analysis • Physics • Cloud estimate modifications • Radiation modifications • High wind surface drag modification • Convective gravity wave drag • Dissipative heating • Snow accumulation consistent between model and post-processor • Land Surface • Removal of soil moisture nudging to climatology • Modification of vegetation tables • 20 category high resolution vegetation and high resolution soil type • Spin up of land state

  5. Global upgrade #2 (April 2014)Probable components • Analysis upgrades • GPSRO quality control enhancements + METOP-B GPSRO • Updates to radiance assimilation • Assimilate SSM/IS UPP LAS (1-7,23-24) data for F-17,18 • CRTM v2.1.3 • Unified angle/airmass bias correction • Adjustments to ob errors and channel usage • Satwind data • GOES – hourly data • EUMETSAT cloud top WV winds • EnKF modifications • T574 semi-Lagrangian ensembles • Ensemble hurricane relocation • Stochastic physics for analysis ensembles • Ensemble • Unification of analysis ensemble with GEFS ensemble • Ensemble resolution increase to T574L64

  6. Global upgrade #3 (Dec. 2015)Potential components • Model • Higher vertical resolution (~128 levels) - higher model top • Higher horizontal resolution • Physics • WAM physics for higher levels • Upgraded radiation (incremental neural net) • Enhanced convective parameterization (for higher resolution) • Upgrades to gravity wave drag • Coupled ocean/atmosphere/ice/land (also 1-d lake model) • Upgraded land and ocean models • Non-hydrostatic • NEMS infrastructure

  7. Global upgrade #3 (Dec. 2015)Potential components • Analysis upgrades • Cloudy radiances for microwave observations • Cloudy radiances for IR observations • Additional IASI, AIRS and CrIS channels (esp. moisture channels) • Improved use of surface land variables • Station by station conventional data QC and ob. errors • Bias correction for aircraft observations • 4d hybrid assimilation • Enhanced variational Quality Control • Inclusion of diabatic effects in initialization • Stochastic physics for ensembles

  8. Related global system modifications • Air quality model and Whole Atmosphere Model (WAM) – Unified? • Lower horizontal resolution • WAM • 600km top • High atmosphere physics • Air Quality • Inclusion of aerosols and chemistry • Surface sources (daily estimate) • Volcano sources

  9. Beyond 2016 • Model • Higher vertical and horizontal resolution • Improved physics • WAM and AQ applications – impact on deterministic run • Possible new dynamic core • Analysis • Better use of current data • Use of more data • Improved use of cloud impacted radiances • Collaboration with external groups to enhance global prediction system • All work constrained by available human and computational resources and product delivery requirements

More Related