1 / 12

Rohm and Haas Bristol Polymers

Rohm and Haas Bristol Polymers . Polymers Plant Tour Agenda 9/16/2008. Overview. Conference Room & Plant Tour Areas Tour Safety Discussion Process Discussion #7 Kettle Reactor & Charging #10 Kettle Reactor & Charging Continuous Reactor Area Outside Control Room.

iliana
Download Presentation

Rohm and Haas Bristol Polymers

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rohm and Haas Bristol Polymers Polymers Plant Tour Agenda 9/16/2008

  2. Overview • Conference Room & Plant Tour Areas • Tour Safety Discussion • Process Discussion • #7 Kettle Reactor & Charging • #10 Kettle Reactor & Charging • Continuous Reactor Area • Outside Control Room

  3. Tour Safety Discussion • Stick with Team Leader • Working Unit Shut-down/Starting-up • Avoid Contact With Material • Avoid Touching/Operating Equipment • Listen Carefully to Instructions • Observe and Ask Questions

  4. Process Discussion • Solution Polymerization Reactors -- Kettles • Flammability/Toxicity • Monomer/Initiator Reactivity • Heat of Polymerization • Environmental • Operation of Typical Process

  5. Process Discussion • Continuous Reactor Area • Smaller equipment • Possible because of smaller heat of polymerization • Feed of materials • Mixing/dissolving • Polyurethane ingredients • Pressures/temperatures

  6. #7 Kettle Reactor • Relief valves • Rupture Disks • Vent sizing/thrust • Mitigation of relief hazards (modelling indicates evaporates) • Blow-out walls • Classified area • Remote location/cell • Static/grounding/inertion • Process Energy • Fire protection/safety showers/eyewashes

  7. #7 Kettle Charge Area • Ventilation • Floor Loading Access • Material Handling • Ergonomics – valve handle extensions, drum lifter, catalyst hose balancer • Spill control • Open Vessel Mitigation – closed vessels • Labeling • Static/grounding/inertion • Fire protection/safety showers/eyewashes

  8. #10 Kettle Reactor • Relief valves • Rupture Disks • Vent sizing/thrust • Mitigation of relief hazards (modelling indicates evaporates) • Blow-out walls • Classified area • Special maintenance/training/test procedures • Static/grounding/inertion • Process Energy – Kettle is smaller for pressure • Fire protection/safety showers/eyewashes • Pressure operation/access control

  9. #10 Kettle Charge Area • Ventilation • Floor Loading Access • Material Handling/Labeling • Ergonomics – valve handle extensions, drum lifter, catalyst hose balancer • Spill control/cleaning station • Open Vessel Mitigation – closed vessels • Local DCS access • Static/grounding/inertion • Fire protection/safety showers/eyewashes

  10. Continuous Reactor Area • Equipment size/Capacity • Relief • Interlocking/pressure switch • Scale of equipment much smaller • Process intensity • Ventilation • Remote operation, splash hazard for key operation • Fire protection/safety showers/eyewashes

  11. Outside Control Room • Distributed Control Systems – Remote Operation, Alarming, Data • PLC – Programmable Logic Controllers • Local/Hardwire (Relays) • Alarm/Panel alarm • Interlocking • Manually Operated Remote Control • Data Trending & Alarm History • Sequence Operation • Recipe Operation • Standard operation procedures, charge/react/package/integrity

  12. Post Tour Review • Questions • Observations • Thank You for Visiting!!

More Related