KaoS meeting. T.Gogami 20/May/2011. Contents. Experimental setup Fiducialization of KaoS Works. Experimental setup. Pre- c hicane. SPECROMETER-C. Target ( 7 Li, 9 Be). KAOS. Experimental setup. Experimental parameters of this beam time. Pre- c hicane. SPECROMETER-C.
E N D
KaoS meeting T.Gogami 20/May/2011
Contents • Experimental setup • Fiducialization of KaoS • Works
Experimental setup Pre-chicane SPECROMETER-C Target (7Li,9Be) KAOS
Experimental setup Experimental parameters of this beam time Pre-chicane SPECROMETER-C Target (7Li,9Be) KAOS Electron Beam : 1.5 [GeV]
Angle adjustment of KaoS Target Laser and Guide line in KaOS Laser and target and point-A Guide line Laser Point-A Precision ~ [mm]
How to move KaoS PUSH Special oil
Level adjustment of KaoS • Twomarkers on wall of the hall • One marker on KaoS Marker
Other works • Fixing bad channels of TOF counters. • Pedestal broadened • ADC channel shift with time • Fixing or replacing power and funs which is not working properly. • PMT gain adjustment with radiation source (Nagao-kun) • Labeling for TOF counters • Around modules • Just after photo multi proportional tubes (Tsukada-san) • Etc.
Several photos BEAM Photon dump Photon Photon dump Aerogel Target
Summary The beam time will be started on 24thof May