1 / 7

BI MD during block 2 ( Wed 29-06 22:00 – Thu 30-06 06:00)

BI MD during block 2 ( Wed 29-06 22:00 – Thu 30-06 06:00). A.Boccardi , D.Bellorad , E.Bravin , E.Calvo , B.Dehning , J.Emery , M.Favier , A.Guerrero , A.Jeff , R.Jones , T.Lefevre , A.Rabiller , F.Roncarolo , R.Steinhagen , M.Sapinsk et al. MD overview/motivation Plan proposal

iman
Download Presentation

BI MD during block 2 ( Wed 29-06 22:00 – Thu 30-06 06:00)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BI MD during block 2(Wed29-06 22:00 – Thu 30-06 06:00) A.Boccardi, D.Bellorad, E.Bravin, E.Calvo, B.Dehning, J.Emery, M.Favier, A.Guerrero, A.Jeff, R.Jones, T.Lefevre, A.Rabiller, F.Roncarolo, R.Steinhagen, M.Sapinsk et al. MD overview/motivation Plan proposal Open questions LSWG – 24 Jun 2011

  2. MD overview (I) Study the accuracy and resolution of transverse profile monitors, AGM, LDM, BPMs, Schottky, BCTs BPM • Response vs bunch intensity • Directivity (single chamber-2 beams BPMs) BCT • DC BCT vs FBCT studies • FBCT response vs bunch intensity SCHOTTKY • Response to different beam conditions • Response vs offset w.r.t. beam orbit (bumps) Abort Gap Monitor • Response to light entrance angle (internal steering) and position (bumps) after the installation of diffusers in front of the PM • Response after switching off RF (450 GeV) Longitudinal Density Monitor • Response to light entrance angle (internal steering) and position (bumps) • Response to different transverse beam sizes LSWG - 24 Jun 2011

  3. MD overview (II) WS • Response to PM gain / filters • Test algorithms for background subtraction (particularly B1) • Track emittance from PSB to LHC • Study blow-up induced by scans BSRT • Absolute magnification during closed orbit bumps • Focusing studies BGI • Signal/noise vs intensity vs gas pressure • Absolute calibration with closed orbit bumps WS-BSRT-BGI Cross calibration • Compare the 3 instruments under different beam conditions LSWG - 24 Jun 2011

  4. MD plan proposal (I) Most of the studies: B1 + B2 PERIOD 1: 450 GeV, 1 bunch with I >= 1.1e11 p • BPMs response while scraping down to pilot bunch intensity • Parasitic studies with all other monitors PERIOD 2: 450 GeV, 4 bunches with I >= 2e11 p/bunch • DC BCT and FBCT response while scraping down to pilot bunch intensity • Parasitic studies with all other monitors PERIOD 3: 450 GeV, 6 bunches with I ~= 1.1 p/bunch uniformly distributed in the ring • AGAP response after switching RF OFF • No abort gap cleaning during the study, put it ON if necessary before the dump PERIOD 4: 450 GeV, 12 bunches with I >= 1.1 p/bunch • Closed orbit bumps crossing IR4, as done at 3.5 TeV during MD1 • This time bumps have to pass through Schottky monitors We may combine Period 1 in Period 2 (and use only 4b with I>=2e11p/b LSWG - 24 Jun 2011

  5. MD plan proposal (II) Most of the studies: B1 + B2 PERIOD 5: 3.5 TeV, 12 (or 24) bunches with I>=1.1e11 p/bunch (uniform emittances) + 1 pilot with as small as possible emittance (pilot bucket well separated from others) • Closed orbit bumps as during MD1 • WS-BSRT-BGI cross calibration (especially B1 that was lost last time) • ‘Ultimate’ WS-BSRT resolution if small pilot didn’t blow-up during the ramp • Blow-up only pilot with tune kicker • Then: blow-up everything via chromaticity LSWG - 24 Jun 2011

  6. Outlook • Detailed program will be discussed on Monday within BI • Time estimate for each period • Scraping procedures • Optimize studies that can be done in parallel (B1/B2, different studies at the same time) • Final request for bunch patterns, intensities and average emittances • For the ramp with nominal bunches + small emittance pilot • Is it possible? What’s the smallest pilot we can get? • Damper will blow-up the pilot before-during-after the ramp? • For the 450 GeV period with RF OFF • Do we need cleaning before the dump? LSWG - 24 Jun 2011

  7. BUMPS during MD1 LSWG - 24 Jun 2011

More Related