An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CITY OF LEANDER June 10, 2013 Williamson County Bond Projects 2014-15 Requests

  2. Williamson County Bond Projects CITY OF LEANDER Trails 2014-15 Requests • June 10, 2013

  3. PRIORITY 1 WilliamsonCounty Bond ProjectsTrailsBagdad Heritage Trail ContinuationPhase One TxDOT STP Grant$1.2 million Bledsoe Park Proposed Trail to connect existing Heritage Trail (constructed in 2006 T-21 grant) at Bledsoe Park to Crystal Falls Parkway Bagdad Road TOTAL PROJECT $900,000.00 WILCO Request (80%) $720,000.00 City Match (20%) $180,000.00 Crystal Falls Pkwy

  4. WilliamsonCounty Bond ProjectsTrailsBagdad Heritage Trail ContinuationPhase One TxDOT STP Grant$1.2 million Proposed Trail to connect existing Heritage Trail at Bledsoe Park to Crystal Falls Parkway PRIORITY 1 TOTAL PROJECT $900,000.00 WILCO Request (80%) $720,000.00 City Match (20%) $180,000.00

  5. Williamson County Bond ProjectsTrails183A/Metro Trail PRIORITY 2 Hwy 183 Proposed Trail to connect existing 183A Trail to Metro Station to Hwy.183 Approx. 7500 ft HWY 183A Capitol Metro Station Hero Way Mel Mathis Blvd FM 2243 TOTAL PROJECT $600,000.00 WILCO Request (80%) $480,000.00 City Match (20%) $120,000.00

  6. Williamson County Bond Projects CITY OF LEANDER Roadways 2014-15 Requests • June 10, 2013

  7. Williamson County Bond ProjectsRoadwaysHero Way East and West Proposed Roadway Improvements connect from Reagan Blvd to Lakeline Extension PRIORITY 1 HWY 183 PHASE TWO PHASE ONE Hero Way Reagan Blvd FM 2243 FM 2243 Bagdad Rd HWY 183A Lakeline Extension TOTAL PROJECT (PH 1) $17,000,000.00 WILCO Request (50%) $8,500,000.00 City Match (50%) $8,500,000.00 TOTAL PROJECT (PH 2) $9,000,000.00 WILCO Request (50%) $4,500,000.00 City Match (50%) $4,500,000.00 Crystal Falls Pkwy

  8. Williamson County Bond ProjectsRoadwaysHero Way West PRIORITY 1 Proposed Roadway Improvements connect from Reagan Blvd to Lakeline Extension Western Phase heavily constrained with utility lines and open drainage

  9. Williamson County Bond ProjectsRoadwaysHero Way East Proposed Roadway Improvements connect from Reagan Blvd to Lakeline Extension PRIORITY 1

  10. Williamson County Bond ProjectsRoadwaysBagdad Road North CR280 Collaborative Way High School #6 San Gabriel Pkwy PRIORITY 2 Halsey Dr Proposed Roadway Improvements from FM2243 to CR 280 TOTAL PROJECT $9,000,000.00 WILCO Request (50%) $4,500,000.00 City Match (50%) $4,500,000.00 FM2243

  11. Williamson County Bond ProjectsRoadwaysBagdad Road North PRIORITY 2 Proposed Roadway Improvements from FM2243 to CR 280 TOTAL PROJECT $9,000,000.00 WILCO Request (50%) $4,500,000.00 City Match (50%) $4,500,000.00

  12. Williamson County Bond ProjectsRoadwaysSan Gabriel Parkway Proposed Roadway Improvements from CR170 to Reagan Blvd. CR170 San Gabriel Pkwy 183A Reagan Blvd Kittie Hill Airport TOTAL PROJECT $7.500,000.00 WICO Request (50%) $3,750,000.00 City Match (50%) $3,750,000.00 PRIORITY 3

  13. Williamson County Bond ProjectsRoadwaysSan Gabriel Parkway Proposed Roadway Improvements from CR170 to Reagan Blvd. TOTAL PROJECT $7,500,000.00 WICO Request (50%) $3,750,000.00 City Match (50%) $3,750,000.00 PRIORITY 3

  14. CITY OF LEANDER Williamson County Bond Projects 2014-15 Requests Summary June 10, 2013 Trails Total $1,500,000.00 Wilco $1,200,000.00 (80%) City $300,000.00 (20%) Roadways Total $42,500,000.00 Wilco $21,250,000.00 (50%) City $21,250,000.00 (50%) Combined Total $44,000,000.00 Wilco $22,450,000.00 (51%) City $21,550,000.00 (49%)