AB-ABP Group Meeting. Introduction and motivation. Summary of the 2007 MARS exercise: achievements and future objectives. Group structure and members. Update on the LHC schedule. AOB:. Feedback on the future of the ABP group forum?
E N D
AB-ABP Group Meeting Introduction and motivation • Summary of the 2007 MARS exercise: • achievements and future objectives Group structure and members Update on the LHC schedule AOB: • Feedback on the future of the ABP group forum? • feedback via section leaders ABP Group meeting; 1.6.2007 1
ABP Organization Chart 2007 O. Brüning S. Baird M. Macchi (AB/ADM) M. VitasseM. Cayla1 HSL CC3 LIS LCU RTL Rings & Transfer Lines Hadrons Sources & Linacs LHC InjectorSynchrotrons LHCCommissioning& Upgrade CLIC & CTF3 R. Scrivensms S. Baird2 G. ArduiniCIC M. GiovannozziCIC H. Braun8 R. Brownt,msiS. De Man1,t, dt,msiN. Gilbertt, msi(M. Korazinos)C. Lacroixt, msiJ. MonteiromsiB. Pirest, dtR. PrincipeM. Samson G. BellodimsS. Bertolo G. BourgeoisB. HadornC. HillD. KuchlermsA. Lombardi9,msC. Mastrostefanot,msiM. O’Neildt,msF. Wenanderms O. Berrig C. CarlimsM. ChanelmsS. GilardonimsM. Martini0S. Maury3E. MétralmsI. Papaphilippoums G. Rumolo(ms) R. Assmann4,CICH. Burkhardt5S. Fartoukh6,CICW. HerrJ. JowettM. MeddahiE. MétralmsT. Risselada F. Schmidt7R. TomasF. ZimmermannCIC H. BurkhardtR. Corsini J.- B. JeanneretM. MartiniI. PapaphilippoumsL. Rinolfi0G. RumoloD. Schulte R. Tomas MS: Machine supervisors (0): AB Training Officer MSI:Machine superintendents t : TSO; dt : Deputy TSO (1) : detached to TS/IC(2) : Consolidation Project Leader(3) : I-LHC Project Leader (4) : Collimation Project Leader(5) : Computer Administration (6) : Magnet Evaluation Activity Leader (7) : MADX Custodian(8) : CTF3 Dep. P. Leader; CLIC Design (9) : LINAC4 dep. Project Leader 2 1.2.2007
ABP Students, Fellows and External Members RTL HSL CC3 LI S LCU Rings & Transfer Lines Hadrons Sources & Linacs LHC InjectorSynchrotrons CLIC & CTF3 LHC Commissioningand Upgrade S. Baird R. Scrivens G. Arduini M. Giovannozzi H. Braun Thomas MeinschadSara LanzoneJean-Babtist LallementMohammed Sayed EshraquiEdgar Sargsyan Elena BenedettoAndrea FranchiJavier BarrancoBenoit SalvantDiego QuatraroHubert MedinaSandra Aumon Marius JuchnoThomas Edgecock Ilya AgapovThomas WeilerChiara BraccoRoderik BruceUlrich Dorda Riccardo de Maria Tatiana PieloniValentina PrevitaliSimon WhitePaul Anton LetnesGlenn VanbavinckoveSantiago IbonMikael JorgensenRama Calaga Federico RoncaroloDobrin KalchevAlexander Ryazanov Maxim KorostelevAndrea LatinaPeter UrschützErik AdliGabriel GourieHamed ShakerWarner Bruns Arnaud Ferrari 5 (-2) 8 (-3) 9 (+4) • 39 additional active group members (+9; difference w.r.t September. 2006) 17 (+10) 8 Fellows; 2 Marie Curie Fellows;10 Doctoral Students;4 Technical Students;4 External Students; 2 Summer Students;9 PSA & UPAS 3 1.6.2007
Repairs Sector Test Operation testing Machine Checkout Beam Commissioning to 7 TeV Schedule – draft to be consolidated Mar. Mar. 10 10 11 11 12 12 13 13 Apr. Apr. 14 14 12 23 34 45 56 67 78 81 15 15 16 16 17 17 18 18 May May 19 19 20 20 21 21 22 22 Jun. Jun. 23 23 24 24 25 25 26 26 27 27 Jul. Jul. 28 28 29 29 30 30 Aug. Aug. 31 31 32 32 33 33 34 34 35 35 Sep. Sep. 36 36 37 37 38 38 39 39 40 40 Oct. Oct. 41 41 42 42 43 43 44 44 Nov. Nov. 45 45 46 46 47 47 48 48 Dec. Dec. 49 49 50 50 51 51 . 52 52 Jan. Jan. 01 01 02 02 03 03 04 04 05 05 Feb. Feb. 06 06 07 07 08 08 09 09 10 10 Mar. Mar. 11 11 12 12 13 13 14 14 Apr. Apr. 15 15 16 16 17 17 18 18 May May 19 19 20 20 21 21 22 22 Jun. Jun. 23 23 24 24 25 25 26 26 27 27 Jul. Jul. 28 28 29 29 30 30 31 31 32 32 Aug. Aug. 33 33 34 34 35 35 Sep. Sep. 36 36 37 37 38 38 39 39 Oct. Oct. 40 40 41 41 42 42 Interconnect; Leak test; Pressure test; Flushing; Cool down; Powering tests; 43 43 44 44 Nov. Nov. 45 45 46 46 47 47 48 48 49 49 Dec. Dec. 50 50 51 51 52 52 . Prepared by Katy Foraz R.Bailey, LTC, May 2007
Transfer line test with beam in 2007 (Jan) • Low I then High I for both lines • Film badges needed afterwards • Must be avoided • Proposals • TI8 • Delay tests • Low I in September • Sector test • High I Afterwards • TI2 • Maintain dates • Reduce scope (only Low I) • Stop beam before end of line • Add shielding • More studies needed R.Bailey, LTC, May 2007