1 / 8

Aircraft Access to SWIM (AAtS)

Aircraft Access to SWIM (AAtS) . FY11 planned Demo activities. Agenda. AAtS Overview AAtS Notional Architecture NAS Data Elements FY11 Activities AAtS Aviation Outreach Study FY12 – 13 Activities. AAtS Overview.

iorwen
Download Presentation

Aircraft Access to SWIM (AAtS)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aircraft Access to SWIM (AAtS) FY11 planned Demo activities

  2. Agenda • AAtS Overview • AAtS Notional Architecture • NAS Data Elements • FY11 Activities • AAtS Aviation Outreach Study • FY12 – 13 Activities

  3. AAtS Overview • Connect NAS services enabled by FAA’s System Wide Information Management (SWIM) to aircraft • Improve situational awareness for aircraft by facilitating dissemination of operational & supplementary NAS information via the SWIM based network • Only SWIM-enabled NAS services will be available via AAtS • Not intended for uses that will directly effect the trajectory of the aircraft • Initial AAtS Concept • Will utilize existing NAS and aircraft infrastructure • The FAA will not be acquiring a specific infrastructure to support the deployment of AAtS. • Electronic Flight Bag (EFB) used to display NAS information in aircraft (e.g., Class II PED or iPad)

  4. Future Service Notional AAtS Architecture (initial) LEGEND Wireless transmission Dedicated telecom + VPN backup VPN via internet NAS Systems Operator (e.g., 121 transport carrier) ERAM AIM TFMS TCP/IP Capable transmission medium (VPN Continuity) CIWS TDDS Value added Service Provider (VASP) Exchange Service NESG SWIM ITWS Future Service • One way • Product based • Proprietary Value added Service Provider (VASP) Broadcast Service WMSCR Future Service

  5. NAS Data Elements • Possible NAS Data for AAtS dissemination include: • Flight delays • Flight planning information • Alternate Routing information • Traffic management information • Airport info (e.g., runway configuration & status) • NOTAMs • Temporary flight restrictions (TFR) & special activity airspace (SAA) • Weather

  6. FY11 AAtS Activities • Concept of Uses (ConUse) Document • AAtS Aviation Technology Study • Technical Tests & Operational Demonstration at NextGen Daytona Beach Test Bed • Developing AAtS Test Plan • System End-to-End Technical Tests • Human In The Loop (HITL) Demo • Schedule Target for 1st Demo Aug/Sep 2011 • Possible Use Case Scenarios • NOTAMs, TFRs, Weather Data • AVS and Guidance Impacts

  7. AAtS Aviation Technology Study • Objectives • Seek input from industry on expected equipment solutions • Validate known technical issues • Identify other technical design & implementation challenges • Obtain commitments of interest & resources from aviation community to demonstrate AAtS capabilities for follow-on activities • Anticipated Participants • Operators (e.g., airlines, aviation associations, etc) • Broadband data transport service providers • Content and/or content management service providers

  8. FY12 – 13 Activities • Iterative Testing of Ground Technology (Daytona Beach NTB) • Additional use cases, service providers, EFBs & aircraft • Operational / HITL Tests • Develop AAtS Requirements Documents • Enterprise Architecture (EA) artifacts • Rigor with SWIM / NAS architecture • Node-on-the-Net architecture • Derived Connectivity requirements • Perform Capability Analysis (lessons learned) • Develop Safety Analysis and Metrics • Conduct Operational Trials • Identify any ATC procedural & AVS policy impacts • Projected operational usage of AAtS is 1st Qtr FY14

More Related