1 / 24

High Speed Rail

High Speed Rail. San Mateo Union High School District March 11, 2009. CARRD - Californians Advocating Responsible Rail Design. Grassroots volunteer organization Process focus  Engage community and encourage participation Watchdog for transparency

iren
Download Presentation

High Speed Rail

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. High Speed Rail San Mateo Union High School District March 11, 2009

  2. CARRD -Californians Advocating Responsible Rail Design Grassroots volunteer organization • Process focus  • Engage community and encourage participation • Watchdog for transparency • Do NOT advocate for a particular implementation or route Founders • Nadia Naik, Elizabeth Alexis, Rita Wespi, Sara Armstrong • We are not train experts, we are not lawyers • Contact info  • website: www.carrdnet.org • email: info@carrdnet.org

  3. Considerations for School Districts Focus areas for schools • Noise Pollution & Vibration Impacts • Safe Routes to Schools & Corridor Safety • Construction Impacts • District Budget Impacts Officially Participate in Environmental Process • Ensure your districts unique characteristics and concerns are part of the planning • Consider mitigations needed and costs to District Start planning now for how to accommodate the project • Independent analysis and experts where needed

  4. Deadlines Program Level EIR • 45 days to respond starting today! Project level • Expected release April 11 • 45 days to respond

  5. Noise Pollution - Impacts on Learning Excessive Noise negatively impacts learning Children are more sensitive to noise than adults Documented Critical effects • Speech Interference • Disturbance of information extraction  • e.g. comprehension & reading acquisition • Message communication • Annoyance • Other health issues (high blood pressure) - weaker correlation

  6. Noise Pollution & HSR Benefit: Grade separation should eliminate/reduce horn noise Benefit: Engine noise reduced by electrification Potential negative changes • Air frame noise increased • Rapid onset of noise with higher speeds more disruptive Number of trains/hour (tph) will increase • 2035 Peak: 12 Caltrain + 18 HSR tph = 30 tph Elevated alignment = noise propagates twice as far as at grade 

  7. Noise Pollution - Resources Quite Classrooms: www.quiteclassrooms.org ANSI - Classroom Acoustic Standards WHO - Guidelines for Community Noise • Inside Classroom: 35 dB LAeq • Outside playgrounds: 55 dB LAeq FRA, FTA, OSHA, EPA all have guidelines, mitigations, etc

  8. Vibration Impacts Generally considered together with noise, but • more complex and harder to measure • less research has been conducted Characteristics • Physical rattling, shaking, rumbling noises • Critical Effect on Humans = Annoyance • Typically only perceptible indoors  • Scientific instruments are more sensitive than people Vertical alignment may reduce/increase vibration

  9. Safe Routes to School & Corridor Safety Benefit: Grade Separations dramatically increase safety! Benefit: Improved access control of corridor Consider implications of different vertical design alternatives • road underpass tunnels may have an isolation effect • road overpasses may result in loss of turning movement • changes in bike lanes, sidewalk availability Traffic volumes and flow analysis should consider all modes • Vehicular, bicycle and pedestrian  • Special concern if mode shift occurs due to changes

  10. Construction Impacts Average 3-7 Years of construction Caltrain & Freight Service will continue to operate • possible temporary "Shoofly" tracks adjacent to corridor  • example: San Carlos grade separation at Holly Street Traffic flow and heavy equipment Noise, vibration, dust, debris from construction • air quality Soil safety

  11. Engagement With HSRA • Officially  via comments to the Environmental Review process • As a CSS Stakeholder With your community • PTA, student body • each City has liaisons for HSR   • Peninsula Cities Consortium www.peninsularail.com

  12. Thank You! www.carrdnet.org info@carrdnet.org

  13. Backup Slides

  14. Noise Pollution - Measurement Intensity of sound - decibels (dB)  • Logarithmic scale = NOT linear • 30 dB to 40 dB is TWICE the perceived loudness Proximity to source Frequency (Hz) Noise level over time (LAeq)

  15. Mitigating Noise Pollution Source Treatments • Vehicle Design • Track design & maintenance • Operational Restrictions (eg limiting nighttime operations) Path Treatments • Sound Walls Receiver Treatments • Building insulation • Windows, but requires A/C

  16. Noise Pollution in EIR Submit comments to the Program and Project EIR process Provide inventory of all your schools near the corridor • assume elevate structure • 900 feet on either side of tracks • 1/4 mile radius from Stations Be Specific • document location, student population, hours, layout • reference standards (ANSI, WHO, etc) • request specific analyses and mitigations Consider independent assessment

  17. Safe Routes to School EIR Submit comments to the Program and Project EIR process Identify schools that include the corridor w/in their boundaries • traffic flow at schools can be impacted by changes upstream • describe all corridor crossings, including bike/ped  Be Specific • how many students cross the corridor to get to school • provide maps if available • identify schools where on site flow is at capacity • request impact study - construction and final

  18. Side-Bar: Program Level EIR Revised Draft of Program Level EIR released March 11 • www.cahighspeedrail.ca.gov/library.asp?p=9274 • CHSRA requested comments focus only on revised material • CARRD encourages stakeholders to submit comments on the *full* record to provide up-to-date information How to Comment - Anyone can comment! • Subject: “Bay Area to Central Valley Revised Draft Program EIR Material Comments”  • Attn: Dan Levitt, California High Speed Rail Authority • 925 L Street, Suite 1425 Sacramento, CA 95814 • comments@hsr.ca.gov • fax to (916) 322-0827

  19. HSR Overview November 2008 - Prop 1A authorized State Bond Funds • plan, construct and operate a High Speed Train system from San Francisco to Los Angeles/Anaheim High Speed Rail Authority • 9 appointed Board members • less than dozen state employees • 4 tiered web of consultants / contractors do the bulk of the work Funding • Estimated cost of backbone system (SF-LA/Anaheim): $42.6 B  • State bonds: $9 B • Federal ARRA funds: $2.25B  • additional funds from Federal, local cities, and private companies are anticipated

  20. Caltrain Corridor – top speed 125 mph • Requires 2 additional dedicated tracks on right-of-way • Freight is expected to run only at night • All intersections with rail must be grade separated • Elevated • At-grade (road goes over or under) • Trench • Tunnel • Continuous Operations Local Implementation

  21. SF-SJ Segment • Program Level Environmental Impact Report (EIR) • Bay Area - Central Valley - initially certified Jun 08 • Decertified Dec 09 – must be re-circulated • Potential route change • Project Level EIR • Upcoming “Alternatives Analysis” • Committed to Context Sensitive Solutions (CSS) as preferred process

  22. Federal Grants $17 - $19 billion • State Grants $9 billion • Local Grants $4 - $5 billion • Private Investors $10 - $12 billion • Total: $42.6 billion • Awarded $2.25 billion stimulus funds • Plan calls for $3 Billion in Federal funding every yr for 6 yrs Funding Plan

  23. What is Context Sensitive Solutions (CSS)? • Collaborative approach • Involves all stakeholders • Works by consensus • Balance transportation needs and community values • Proven Process

More Related