User Compensation for NEC Storage Curtailment – Draft Proposal. Transmission Workstream 14/12/2005. Aims. Appropriately compensate Users affected by Storage Curtailment Ensure that Users remain appropriately incentivised to contribute to the physical balance of the system
E N D
User Compensation for NEC Storage Curtailment – Draft Proposal Transmission Workstream 14/12/2005
Aims • Appropriately compensate Users affected by Storage Curtailment • Ensure that Users remain appropriately incentivised to contribute to the physical balance of the system • Recognise that rights to the gas held in Storage remains with the User
Proposed Compensation Amount SAP – (ASSAP + 0.0611p/kWh) Where, ASSAP = Volume weighted average summer SAP for previous Gas Year 0.0611p is the mod 0433 derived minimum differential between SMPBuy and SMPSell • Compensates for the difference between the cost of getting summer gas to the winter NBP and the value of the gas on the day.
Effect on 0052 arrangements • Removes the SWCQ Trade • Compensation claim available amount derived across whole period not for each individual curtailment event • Retains Curtailment Quantity Claim process (time extended to 04:00 on D) • Retains an after-the-day (storage allocation based) compensation adjustment mechanism. • Retains funding via Neutrality
Example User Injects 25 units between curtailment periods 1st Curtailment Period 2nd Curtailment Period