Northeast Water SystemInformational Meeting November 29, 2010
Northeast Water System Agenda • Project Update • Construction Schedule & Progress • Water Rate & Billing • Taps Availability & Procedures • Households Connection Assistance • Project & Water System Contact Information
Northeast Water System Construction Schedule & Progress: ContractCompletion Date • A – Pump Station 12/14/2010 • B – Water Tank 12/14/2010 • C – Electrical 12/14/2010 • DI – Waterline 11/03/2010 • DII – Waterline 11/03/2010 • DIII – Waterline 12/10/2010
Northeast Water System Water Rate & Billing: • Rate – $6.95 per 1000-gallon • Toledo water rate increase by 9.9% - Northeast water rate would be $7.11/1000 gal • Minimum Water Bill – 1000-gallon per month • Bi-Monthly Billing • Water Bill from Fulton County • Water Bill to Property Owner • Payment Options • Delinquent Accounts
Northeast Water System Taps Availability & Procedures: • Tap Application • Tap Fees & Waiver
Northeast Water System Taps Availability & Procedures: • Service Line & Meter Specifications • Service Line Diagram • Pressure Regulator Valve
Northeast Water System Taps Availability & Procedures: • Approved Tapping Contractors
Northeast Water System Taps Availability & Procedures: • Existing On-Lot Water Source (s) • Tap Work Inspection
Northeast Water System Households Connection Assistance: Steve Brown Regional Planning Commission 152 South Fulton Street, Suite 230 Wauseon, Ohio 43567 (419) 337-9214
Northeast Water System Project & Water System Contact Information: Kelly Borton Kenny Cowell Rick Meiring Ziad Musallam Fulton County Sanitary Engineer 125 South Fulton Street, Suite 240 Wauseon, Ohio 43567 Phone (419) 337-9263 www.fultoncountyoh.com
Northeast Water System Summary & Notes: 1. Project completion dates are based on Toledo Edison progress in providing power service to the pump station. 2.Northeast Water System rate may increase if Toledo rate is increased by 9.9%. 3. Billing is expected to be done around the 1st of each period (bi-monthly) and due in 15 days with 10% late charges. Water use rules and regulations are available on-line or by calling the office. 4. Fulton County will notify all potentially new customers of waterline availability to tap. 5. Tap fee ($1000) waiver will be valid for 6 months from the date of waterline availability. 6. Service line and meter specifications are available on-line or by calling the office.