1 / 23

Briefing on the Embarcadero

Briefing on the Embarcadero. Thank you Realtors for joining us. OBJECTIVES. Milestones Recent Accomplishments Future Projects Recognition Photos Challenges Upgrades. Milestones we have reached:. Completed a Full Audit – No Problems Completed Reserve Study – Adopted to fully fund

Download Presentation

Briefing on the Embarcadero

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Briefing on the Embarcadero Thank you Realtors for joining us

  2. OBJECTIVES • Milestones • Recent Accomplishments • Future Projects • Recognition • Photos • Challenges • Upgrades

  3. Milestones we have reached: Completed a Full Audit – No Problems Completed Reserve Study – Adopted to fully fund Reserve Program (Common Areas, RLC & Marina) on track and on budget

  4. Recent Accomplishments Sealing the envelope through roof and deck work – addressing all dry rot found Last condo roof “I” building completed 2010 RLC Roof scheduled for this fall Gutter program for completed decks and new siding Remodel Fireside Room Upgrade Restaurant Upgrade gift store Landscaping Upgrades

  5. Future Projects • Rebuild marina • Reduce sediment entering our marina • Achieve land lease cost reduction goals • Major energy savings programs • Continuation of deck replacement program

  6. Deck Schedule(Decks, Doors, Windows, Thresholds, Shingles…) • Decks Completed 2008/2009 35 • Decks scheduled 2010 43 • Decks scheduled 2011 43 • Decks Scheduled 2012 43 • Decks scheduled 2013 43 • Decks scheduled 2014 46 • Total decks to be completed 253

  7. Chamber Recognition Leading to Increased restaurant trafficAnd increased room occupancy rate

  8. Now, here are some photos of what we have done so far…

  9. Roofs Scheduled 2010“I” Building RLC Bldg.

  10. Dry Rot found during deck work

  11. Completed DecksWood Vinyl

  12. Beam Replacement

  13. New Building Gutters

  14. C Building ImprovementsBefore & After

  15. C Building ImprovementsBefore & After

  16. Directional Signs

  17. Fireside Room Now Updated

  18. Restaurant has a new look

  19. Gift Shop Modifications

  20. Objectives Energy Conservation $48,355 less rebate $25,948 = $22,407 Vapor Barrier Wrapped Pipes Under-floor insulation Water-saving shower heads (w/rebate)

  21. 2010 Reserve Fund Projects • Boardwalk Repairs $ 22,500 • Dry Rot decks/doors/windows $474,300* • Fireside/Restaurant Carpet $ 18,250 • “I” Building Roof & Skylights $ 65,925* • Deck and Roof Gutters $ 9,610* • “F” Building Support Beams $ 45,000 • HVAC (heating, venting, air conditioning)$ 84,000 • RLC Roof Replacement $151,745 • Marina Lockers/Floats by Charter Area$ 76,200* • Whaler Wood “C” Dock $ 50,000 • Electrical Upgrade “E” dock $ 30,000 *continuing projects

  22. ~It’s all about the view~

  23. We would love your feedback • Comments/Impressions Please • Questions? • This presentation can be found on our website: www.embarcaderouoa.com under “Realtor Corner”