650 likes | 1.79k Views
Enterprise Applications Center of Excellence. A Maturity Model Michael Doane META Group. Why an ERP Center of Excellence?. An optimization of business processes that drive business benefit continually An optimization of end user competency and employee fulfillment of business processes
E N D
Enterprise Applications Center of Excellence A Maturity ModelMichael DoaneMETA Group
Why an ERP Center of Excellence? • An optimization of business processes that drive business benefit continually • An optimization of end user competency and employee fulfillment of business processes • Continued coherence and integration of functionality and data through all process chains
Center of Excellence Functions Business Prepare the company for transformational change (all the time) To Be Continuous business improvement Optimization of current system usage As Is Maintenance and support of ERP and related functions (ERP/CRM/SCM) IT Parameters: Business Applications Span (ERP is the backbone)
The Enterprise Applications Value Chain Profit & Loss Key Performance Indicators • Sample Business Performance KPI’s • Return on sales • Return on assets • Net sales per employee • Ratio of Assets/Liabilities • It is imperative to link end users to profit & loss • Without measurement, you cannot begin • Business process improvement is the source of measurable business improvement • IT also has its ‘business processes’: reduction of IT costs applies to this value chain Business Process Drivers Sample Major Business Processes Order Fulfillment Process Procurement Process Production Process SAP User Competency Software
Foundation of Organization Planning • Two aspects of “IT” • Business-specific activities = the Center of Excellence • Infrastructure/support ~ “Foundation Services” Center of Excellence IT Resource/ Governance Infrastructure/ Operations Architecture
Enterprise Program Management Multi-site Virtual CoE Remote Process Owners Process Oversight Users Users Users Users Users Users Users Users Help Desk Continuous Education Continuous Education Production Logistics Finance Sales Functional Oversight Software Configuration & Support Custom Applications Custom Applications Integration Management (Functional, Cross-Application) Integration Management (Technical) Production Control/Change Management
META Group Maturity Modeling Levels 1-5 Elements or best practices (weighted) Up to 10 per maturity level Categories METAmap (META Group Maturity Assessment Program)
Business/ Enterprise End Level IT Alignment Applications Users Infrastructure There is a link between ERP is not overly Basic end user training is ERP infrastructure is Core ERP 1 business and IT for customized; core complete. adequate. configuration updates. implementation is complete ERP is the backbone of End users fulfill ERP The role of business in ERP enterprise applications. Stable ERP 2 functions without excessive ERP infrastructure is stable. evolution is defined. Applications interfacing is help desk or support. complete. Business has active ERP infrastructure is flexible. ownership of business The applications portfolio is End users receive periodic CoE Defined 3 Apps data is generally processes. Current KPI is inventoried. refresher training synchronized. measured. KPI measures and targets are End users are trained to in the system. EPMO directs The applications portfolio has business processes and Enterprise applications CoE Managed 4 business process been rationalized. continuous training is in infrastructure is flexible. transformation. place. Business process change is End user job performance is Enterprise applications guided by KPI performance The applications portfolio has CoE Evolving 5 linked to business process infrastructure is adaptive to and configuration is in the been optimized. performance applications changes. hands of business. Center of Excellence Maturity Model
Scale 1=Unimportant, 5=Very Important The Consequences of Implementation Concerns Pre Implementation Mistakes Noted After Implementation Source: The State of ERP Services Multi-Client Study, META Group 2003
0 / 10 Do you have some form of a CoE? • Yes • No Cross-Tab Label
Level 1 Core ERP • ERP is at the center of an applications portfolio • The elements for this level are generally identical to those of a successfully completed implementation • It is imperative to keep the project team intact and ready for transfer to the Center of Excellence
Level 2 Stable ERP • Most new ERP installations take 3 to 4 months to achieve a state of stability • In this period, project staff transitions to the Center of Excellence
Level 3 CoE Defined • After stabilization of ERP, the Center of Excellence is functional • Attention turns to measures & benefits
Results by Maturity Elements Results by Category
Overall Results METAmap (META Group Maturity Assessment Program)
0 / 10 Of those who have a CoE, which level have you attained? • Core ERP • Stable ERP • Defined CoE • Managed CoE • Evolving CoE Cross-Tab Label
Keys to CoE headcount control: • Support given to Business Process Owners • Direct software configuration by CoE (business-led) • 3. Active competency management/continuing knowledge transfer
Conclusion/Recommendations • The CoE must be led by business staff and business concerns (measurable) • A CoE will be sustained if measurement and business benefit are at the foundation • People/processes tend to decay through time • Maturity is accelerated when benefits are achieved