1 / 1

Mounting Instructions IC 110 Rail Kit for Ecolab Dispenser

Mounting Instructions IC 110 Rail Kit for Ecolab Dispenser. Step 1: Gather needed material: 1 x Ecolab unit , 1 x Rail Mount Kit tagged IC 110 , 2 x M5x8mm Button Head Screws, 2 x Flat Washers. Step 2: Open the cap of the Ecolab unit and identify mounting holes marked by arrow.

ivria
Download Presentation

Mounting Instructions IC 110 Rail Kit for Ecolab Dispenser

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mounting Instructions IC 110 Rail Kit for Ecolab Dispenser Step 1: Gather needed material: 1 x Ecolab unit, 1 x Rail Mount Kit tagged IC 110 , 2 x M5x8mm Button Head Screws, 2 x Flat Washers. Step 2: Openthe cap of the Ecolab unit and identify mounting holes marked by arrow. Step 3: Place the2 x M5x8 Button Head screws and 2 x M5 flat washers provided in the mounting plate and secure the Ecolab unit indicated by arrows to the Rail Mount Kit Step 4: Close the Ecolab cover on the unit and Place completed unit on rail.

More Related