An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Safety concept and scope for WP Controls Fabian Moser February 5, 2010

  2. Introduction F. Moser

  3. Relation to overall project Work-Packages Disciplines Phases F. Moser

  4. Overview F. Moser

  5. Safety strategy F. Moser

  6. Hazard and risk analysis F. Moser

  7. Progress F. Moser

  8. Step 1: Safety Concept document PM-090630-a-FMO F. Moser

  9. Sources of hazards F. Moser

  10. Structure of Preliminary Hazard List Perspectives (safety aspects) F. Moser

  11. Content of Preliminary Hazard List F. Moser

  12. Safety regulations F. Moser

  13. Consequences of the Activity F. Moser

  14. Step 2: Safety Scope document (REF) PM-100114-a-FMO F. Moser

  15. Equipment in scope (ongoing) F. Moser

  16. Preliminary Scope Map Gantry Accelerator Beam Delivery Rotator RFQ RFC Linac/IH Magnet Kicker Chopper Beam Energy Monitors Beam Interlock System Medical Technical Equipment Gantry Structure Alignment Equipment Infra-structure Devices Quality Assurance Dosimetry Equipment BID VAC BI Magnet Kicker Stop Beam Position Monitors Gantry PPS Patient Verification System Medical Imaging Devices SRC MAG PS Magnet Induction (Betatron) Beam Intenstity Monitors Patient Positioning System Medical Software Systems Control System Diagnostic Imaging Review Central Scheduler Treatment to machine conversion Accelerator Control System Beam Delivery Control System DTMI Gateway Patient Record and Verification System Supervisory Control System HIS/OIS Long Term Data Repository PACS Treatment Planning System A&A System Safety & Access Control System Building Automation System Infrastructure F. Moser Data import/export - external sites

  17. Events in scope F. Moser

  18. Required next steps Requires additional manpower F. Moser

  19. Conclusions F. Moser