1 / 5

Synergies and Common Issues with 11-T

Synergies and Common Issues with 11-T. B. Auchmann for the CERN/FNAL 11-T collaboration HL-LHC meeting, Nov. 17, 2011 For 11-T design and schedule: see EUCARD meeting talk by M. Karppinen of Nov. 14 , 2011 http:// indico.cern.ch / conferenceTimeTable.py?confId =152511#20111115.

jacoba
Download Presentation

Synergies and Common Issues with 11-T

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Synergies and Common Issues with 11-T B. Auchmann for the CERN/FNAL 11-T collaboration HL-LHC meeting, Nov. 17, 2011 For 11-T design and schedule: see EUCARD meeting talk by M. Karppinen of Nov. 14, 2011http://indico.cern.ch/conferenceTimeTable.py?confId=152511#20111115

  2. LARP and US Core Programs’ Technology used for 11-T • Conductor • Baseline insulation • Pole pieces, metallic spacers • Ceramic binder/curing matrix • End design experience • Winding/curing tooling + procedure • Handling tooling • Reaction tooling + procedure • Impregnation tooling + procedure • Experience transferred by technicians • Mechanical structure experience • Length scale-up • Lab infrastructure for 2 parallel production lines • Credibility for Nb3Sn accelerator magnet projects B. Auchmann TE-MSC-MDT

  3. Analysis exchange so far .. • Measurement data of HQ and TQ • Exchange on quench simulation and protection strategies • Exchange of ROXIE models B. Auchmann TE-MSC-MDT

  4. 11-T Studies • Insulation alternatives • Passive compensation of persistent currents • Mechanical concepts: • Integrated pole with new gap control and bending (evolution of TQC and HFD ideas). • 2-in-1 version with differential contraction between central posts, gap control, bending. • Pole loading with special care for ends region. • Intra-layer heaters B. Auchmann TE-MSC-MDT

  5. More Common Issues • Tunnel integration:  • Heat extraction (more critical for triplet),  • Electrical connections in tight space (studied also in HL-LHC WP 3, Task 2) • Protection systems: what are realistic delays and thresholds? (currently for nQPS threshold is 800 mV at 3.5 TeV due to electrical perturbations) • Alignment • New conductor generations in PIT an RRP • Radiation resistant epoxies (more critical for triplet) • Gather more experience with cored cable • Study snap back (does it require dedicated correctors?) • Improve analysis capabilities for quench, persistent currents, … B. Auchmann TE-MSC-MDT

More Related