An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress on ICECAL chip test Upgrade of the front end electronics of the LHCb calorimeter E. Picatoste, D. Gascón, A. Sanuy, Universitat de Barcelona Institut de Ciències del Cosmos ICC-UB Calorimeter upgrade meeting – CERN – April 15th 2011

  2. Outline • New measurements setup • New blocks • Sample-and-Hold • Summary & news LHCb Upgrade

  3. New measurements setup • Attenuator: • Better linearity than AWG (<1%) • No need for timing corrections • WaveCatcher: • Better linearity than oscilloscope • PC: • Automatized system

  4. New measurements setup AWG PROBE ATTENUATOR WAVECATCHER

  5. Linearity measurements New linearity measurements started: Results show that a calibration of the amplifier+probe is required

  6. Residual Amplitude • Impact of the residual amplification in reset? • To be tested • Additional switches ? • Not needed according simulations • Few % error in the tail • Measure at 2 points after cycle with main signal: • Just after reset period (beginning of integration period) • End of integration period (effects of the tail of the signal) • Clipping is not perfect => small signal tail ? Measure residual effect 6

  7. Residual Amplitude • Impact of the residual amplification in reset: • Constant value of about 2% • To be tested on the other (11) chips and for each subchannel 7

  8. Residual Amplitude • Effect of the tail of the signal: • Caused by the signal tail; due to not perfect clipping • Measured 12% of the main signal for 1 subchannel of 1 chip • To be checked for the rest of chips • Dividing the integral of the residual signal by the one of the input signal result in 12-13% Qsignal/Qrresidual = 12-13% Qsignal Qresidual 8

  9. New blocks Prototyped in June AMS run: Low noise current amplifier: Basic schemes Integrator: High GBW fully differential OpAmp Could be used in other stages • To be tested in future runs: • Compensation of process variation of amplifier’s input impedance • Track and hold (if needed) • Analogue multiplexer • ADC driver • ADC needs to be characterized • Common blocks: • Clock generation • Biasing (CMOS band gap already exists) Ok, but need to add some tuneability

  10. Track-and-Hold Design example: 12-bit 125MHz Track-and-Hold Hold capacitor Tracking switch • Tracking phase: Qb = -CsVi • Bottom-plate off (before Mix) →Add fixed ΔQ2 • Mix off →Vbx remains ct →Q α Vix • Problems: • Fixed charge error • Fixed clock feedthrough error Bottom plate network to minimize non-linearities • C. Barth and A. Dhurka, “Design and Analysis of low power high speed Track-and-Hold circuits for 6 and 12-bit ADCs”, EE315 (VLSI Data Conversion Circuits) Project, Spring 2008 10

  11. Track-and-Hold OTA specifications • Slew rate: • Time allocated for slewing 1/8 TS • Output signal is 2V maximum => SR = 0.6 V/ns • DC gain: • Assume linear settling • If we require an accuracy ½ LSB => DC gain A0 > 80 dB • As A0 only affects linearly, A0 can be lower and the effect would be calibrated afterwards. • Gain bandwidth product: • GBW = 190 MHz Reuse/adapt existent OTA 11

  12. Summary • New setup is ready to finish the measurements of the input stage (preamp+integrator) • Principle is ok • Good previous results with 12 chips statistics • Need to calibrate new probe • Need to study the effect of bias (op. paint) variation • Impact of the residual amplification in reset? • Additional switches ? • Not needed according simulations • Few % error in the tail • Agreement with first results • Tests to be completed • Characterization of individual blocks to be completed • Preamplifier: • Linear input range is almost 4 mA peak current • Could tolerate unclipped signal • Additional gain trimming should be foreseen • Fully differential amplifier: TbD

  13. Plans Plans for 2011 Test and design until Q3 2011 Prepare a prototype for a run in June 2011 including Track-and-Hold Submit a prototype with few complete channels in Q4 2011 Goal of submitting a complete channel in Q4 2011 should be preserved And for 2012, if everything is ok… Test beam ? Radiation tests? Long term: technology obsolescence… AMS 0.35 um is a “mature” techno We asked to Europractice: 5 years are “guaranteed” Low volume productions are scheduled Production (engineering run) is safe But for desin (MPW runs) we should not relax