CHAMBER PRODUCTION AT CERN 904 RPC upgrade-meeting, 02.Oct.2013 Dong-hyun Kim on behalf of the cern-904 team Department of physics, sungkyunkwan university, korea
Content • Status of Chamber • Plan • Status of Analysis
1. Status of Chamber • Shift to QC4 : 6 RE4/2, 4 RE4/3 Chambers • 1 Chamber built
2. PLAN • Start build a 1 RE4/2 Chamber
3. Status of Analysis • Present at the MUON POG meeting as an observer • Arrange the meeting files • How to load a GRAB files. • How to modify a GRAB ‘.cfg’ file