510 likes | 582 Views
Virtual Environments and Level III Redundancy. A modern, green and fault tolerant approach to radio automation system design. Patrick J. Campion Director of Product Development ENCO Systems, Inc. A simplified view of 20 years of radio automation system integration.
E N D
Virtual Environments and Level III Redundancy A modern, green and fault tolerant approach to radio automation system design Patrick J. Campion Director of Product Development ENCO Systems, Inc.
A simplified view of 20 years of radio automation system integration.
Starting with a 1:1 PC:Studio design based on the following configuration
ONE STUDIO ONE BOX Again, in this model the setup is 1:1 PC:Studio.
4U Rackmount Case • Power Supply • Motherboard • NIC • Video • RAM • Processor • HDD(s) • DVD ROM • PCIe RAID • PCIe Sound • PCI GPI • Cooling Fans
4U Rackmount Case • Power Supply • Motherboard • NIC • Video • RAM • Processor • HDD(s) • DVD ROM • PCIe RAID • PCIe Sound • PCI GPI • Cooling Fans Take that big list of components and fit it into the box
FM ONAIR AM ONAIR PROD1 PROD2 VT STUDIO Conveniently named for demo purposes
Move everything to a rack room FM ONAIR AM ONAIR PROD1 PROD2 VT STUDIO IT RACK ROOM
Add servers and a switch FM ONAIR AM ONAIR PROD1 PROD2 VT STUDIO SERVER ONE SERVER TWO SWITCH IT RACK ROOM
Start connecting cables FM ONAIR AM ONAIR PROD1 PROD2 VT STUDIO SERVER ONE SERVER TWO SWITCH POWER IT RACK ROOM
FM ONAIR AM ONAIR PROD1 PROD2 VT STUDIO SERVER ONE SERVER TWO SWITCH NETWORK IT RACK ROOM
FM ONAIR AM ONAIR PROD1 PROD2 VT STUDIO SERVER ONE SERVER TWO SWITCH KVM IT RACK ROOM
FM ONAIR AM ONAIR PROD1 PROD2 VT STUDIO SERVER ONE SERVER TWO SWITCH IT RACK ROOM
FM ONAIR FM ONAIR AM ONAIR AM ONAIR PROD1 PROD1 PROD2 PROD2 VT STUDIO VT STUDIO SERVER ONE SERVER TWO SWITCH IT RACK ROOM STUDIOS
FM ONAIR FM ONAIR AM ONAIR AM ONAIR PROD1 PROD1 PROD2 PROD2 VT STUDIO VT STUDIO SERVER ONE SERVER TWO SWITCH KVM IT RACK ROOM STUDIOS
FM ONAIR FM ONAIR AM ONAIR AM ONAIR PROD1 PROD1 PROD2 PROD2 VT STUDIO VT STUDIO SERVER ONE SERVER TWO SWITCH AUDIO IT RACK ROOM STUDIOS
FM ONAIR FM ONAIR AM ONAIR AM ONAIR PROD1 PROD1 PROD2 PROD2 VT STUDIO VT STUDIO SERVER ONE SERVER TWO SWITCH GPI IT RACK ROOM STUDIOS
FM ONAIR FM ONAIR AM ONAIR AM ONAIR PROD1 PROD1 PROD2 PROD2 VT STUDIO VT STUDIO SERVER ONE SERVER TWO SWITCH CROSS CONNECTS IT RACK ROOM STUDIOS
SERVER FM ONAIR SWITCH AM ONAIR PROD1 PROD2 VT STUDIO IT RACK ROOM STUDIOS
FM ONAIR FM ONAIR AM ONAIR AM ONAIR PROD1 PROD1 PROD2 PROD2 VT STUDIO VT STUDIO SERVER ONE SERVER TWO SWITCH IT RACK ROOM STUDIOS
SERVER FM ONAIR SWITCH AM ONAIR PROD1 PROD2 VT STUDIO IT RACK ROOM STUDIOS
ONE SITE ONE BOX
LOTS OF PROCESSING POWER • LOTS OF RAM • HIGH PERFORMANCE DRIVES • HIGH PERFORMANCE RAID CONTROLLER • EIGHT OR MORE 1000TX NIC • SERVER CLASS HARDWARE
RAID1 Build one RAID1
RAID1 RAID5 And one RAID5 with the remaining four drives
SERVER VM1 VM2 RAID5 VM3 VM4 VM5 On the RAID1 build our Virtualized Server OS and five Virtual Machines
SERVER FM ONAIR AM ONAIR RAID5 PROD1 PROD2 VT STUDIO
SERVER FM ONAIR STORAGE VOLUME (VIRTUAL SHARE) AM ONAIR PROD1 PROD2 VT STUDIO Then create a virtual share on the RAID5 for storage purposes
VIRTUAL MACHINE • OPERATING SYSTEM • IP AUDIO DRIVER • AUTOMATION SOFTWARE
ONE SITE ONE BOX This model’s biggest flaw is a lack of true redundancy
SERVER FM ONAIR SWITCH AM ONAIR PROD1 PROD2 VT STUDIO IT RACK ROOM STUDIOS
ONE SITE TWO BOXES Solved by going to a model with two duplicate boxes
SERVER1 FM ONAIR SWITCH SERVER2 AM ONAIR PROD1 PROD2 VT STUDIO IT RACK ROOM STUDIOS
Redundancy Software SERVER VM1 RAID5 SERVER RAID5 3000TX pipe between the two boxes and redundancy software added
SERVER FM ONAIR STORAGE VOLUME (VIRTUAL SHARE) AM ONAIR PROD1 PROD2 VT STUDIO SERVER FM ONAIR STORAGE VOLUME (VIRTUAL SHARE) AM ONAIR PROD1 PROD2 VT STUDIO Create two duplicate, synchronous environments.
SMALLER FOOTPRINT • LESS POWER DRAW • LESS COOLING DEMAND • EASIER INTEGRATION • HIGHER QUALITY MATERIAL • EASIER MAINTENANCE • MORE SCALABILITY • BETTER FAULT TOLERANCE • KVM SHARING BUILT IN
Virtual Environments and Level III Redundancy A modern, green and fault tolerant approach to radio automation system design Patrick J. Campion Director of Product Development ENCO Systems, Inc. patrick@enco.com