1 / 4

15 m Long Shaft : Field Quality (incl. b1) @ cold

15 m Long Shaft : Field Quality (incl. b1) @ cold. 90 MB to end 2003 ; 23 in 2004 Foreseen @ Chamonix : 1/3 (400 / 1150) Issues : Shaft insertion/removal Backlog (still 120 MB) : logistics and Rocla (Duration of measurement) (Data reduction (better in Sept, then in 2005))

jada
Download Presentation

15 m Long Shaft : Field Quality (incl. b1) @ cold

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 15 m Long Shaft : Field Quality (incl. b1) @ cold 90 MB to end 2003 ; 23 in 2004 Foreseen @ Chamonix : 1/3 (400 / 1150) Issues : Shaft insertion/removal Backlog (still 120 MB) : logistics and Rocla (Duration of measurement) (Data reduction (better in Sept, then in 2005)) Strategy as long as less than 10.5 MB/week (now 7 MB/week) 2 MB/week : loadline & LHC cycle Extended tests when not limiting the test rate should cover 50 MB / 1000

  2. F.Q. Measurement of MB’s in 2004

  3. SSW (Stretched Wire) @ cold Only system measuring a1 (tilt) Equivalent to Long shaft for b1 in static (Loadline) Need : W/C correlation = 0.3 mrad  0.05 mrad (only 7 MB => improve) Issue : 2 SSW availble and heavily used (SSS) Learning phase for normal operation Proposal : wait for 3rd system (fall 2004)

  4. Field Direction @ Room Temperature Present : (more than) 1 MB/day in SMA18 with SSW Issues : No SSW available (after 8 more MB in SMI2) DIMM calibration/stability to improve (w.r.t. SSW) Limited by logistics Need ? Strategy : install asap F.D. with DIMM in Industry measure as much as possible in SMA18 in the meantime

More Related